9.
INS
TALLA
TION
OF
AIR
HO
SE
S
&
EXTERNAL
C
ONT
ROL
C
ABINET
(M
)
Graf UK Ltd
17
9
INSTALLATION OF AIR HOSES AND EXTERNAL CONTROL CABINET (M)
Position the compressor on top of the control unit and
connect together using the 90-degree hose piece and hose
clamps provided.
7
Connect the air hoses to the nozzles on the controller
(13mm hose to black nozzle and 19mm hose to blue nozzle).
8
Connect hoses as shown (13mm hose to red barbed
connector, 19mm hose to blue barbed connector), secure
with jubilee clips and then feed hoses through duct to
controller ensuring hoses are not kinked.
9
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to each
hose and secure with jubilee clip. Connect to underside of
blanking plug.
10
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and the connect to appropriate barbed connectors on
controller.
11
For instructions on how to set the Date & Time, please refer
to Document No. Graf-0005 Rev. 1. For all other information
please refer to the One2Clean Log Book.
12
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.
Page 2 of 2
T: 01608 661500
|
F: 01295 211333
|
|
www.grafuk.co.uk
Installation of Air Hoses & External Controller
7.
8.
Position the compressor on top of the Control Unit and
connect together using the 90-degree hose piece and hose
clamps provided.
9.
10.
Connect the air hoses to the nozzles on the controller
(black hose to black nozzle and blue hose to blue nozzle).
Connect 13mm
hose here
Connect 19mm
hose here
Connect hoses as shown (black hose to red barbed
connector, blue hose to blue barbed connector),
secure with jubilee clips and then feed hoses through
duct to controller ensuring hoses are not kinked.
11.
12.
For instructions on how to set the Date & Time, please
refer to Document No. Graf-0005 Rev. 1.
For all other information please refer to the One2Clean
Log Book
Install a 90-degree bend on the inlet to the chamber and
feed through the two hoses. Fit barbed connectors to
each hose and secure with jubilee clip. Connect to
underside of blanking plug.
Push blanking plug into end of 90-degree bend. Connect
short lengths of hose to connectors on the blanking plug
and then connect to appropriate barbed connectors on
controller.