43
APPENDIX IV
UAM SERVICE RECORD
MACHINE SERIAL #
CONCENTRATOR TOTAL HOURS RUN
NEXT SERVICE CHECK DUE DATE
ANALYZER SCREEN SOFTWARE REVISION #
GASES USED: (check if available and write down pressure reading)
OXYGEN CYLINDER
KPa
OXYGEN PIPELINE
KPa
NITROUS CYLINDER
Kpa
NITROUS PIPELINE
Kpa
TEST #
DESCRIPTION
(Correspond to
PASS (P)
/
PROBLEM FOUND
steps of the Full Function Test)
FAIL
(F)
(and work carried out)
SYSTEM
1
No modifications & all spares
and accessories present
2
Frame, hardware, wheels
3
Mains cable and gas supply hoses
4
Charging indicator
5
Mains failure icon
6
Battery condition icon
7
Cylinder yokes
8
Cylinder pressure gauges
9
Pipeline pressure gauges
10
Maximum O
2
and N
2
O flows
11
Zero O
2
and N
2
O flows
12
Emergency O
2
inlet
OXYGEN CALIBRATION, SAFETY AND QUALITY
13
Calibration with 100% O
2
14
Calibration with Air
15
Upper and lower O
2
alarms
16
N
2
O cut-off
17
O
2
sensor disconnect alarm
18
O
2
concentrator output
BREATHING SYSTEM
19
Apnea alarm
20
Air intake valve
21
Reservoir bag
22
Bellows assembly condition
23
Bellows expiratory pressure
24
Patient water trap (if applicable)
25
Fenton balloon operation
26
Pressure relief valve
VAPORIZER
27
Vaporizer condition and indicator
28
Vaporizer performance
29
Residual flow test
30
Complete and adhere service label
Service carried out by (name of technician):
Signature: Date:
Summary of Contents for Universal Anaesthesia Machine
Page 1: ...Universal Anaesthesia Machine Maintenance Manual...
Page 14: ...12...
Page 39: ...37 2 3 6 41 35 33 32 36 32 34 38 37 35 33 32 36 41 32 6 4 5 46 15 45 49 48 B B...
Page 40: ...38 41 36 37 39 6 40...
Page 41: ...39 25 27 29...
Page 48: ...NOTES...
Page 49: ......