Select
Select
Select a
a
a Location
Location
Location
When selecting a location for the STU assembly,
make sure the location:
• Is close to where the fluid is being delivered to
minimize back pressure and maximize flow rate.
• Provides enough room around the equipment for
maintenance.
• Does not interfere with opening the control panel
door or frame door (on one or both sides).
• Provides enough room on the right and/or left side
of the SaniForce STU to easily load and unload
fluid totes with a forklift or pallet jack hand truck.
• Provides easy and safe access to the air supply
shutoff valves and the control panel. Graco
recommends a minimum of 3 ft (0.91 m) of open
space in front of the panel.
• Provides enough overhead clearance (10 ft, 2.7 m
recommended) for installing and servicing the STU.
• Has a flat, level floor or level pads.
Move
Move
Move the
the
the Frame
Frame
Frame to
to
to the
the
the Selected
Selected
Selected
Location
Location
Location
The frame is shipped with several major
components attached and weighs about 1500 lb
(680 kg). To avoid injury and equipment damage,
follow instructions below.
The STU must be firmly attached to the floor. The
STU is capable of exerting downward force of 2220
lbf (9.9 kN) which could cause the STU to lift off of
the floor during operation.
• Use a forklift or hand truck and support devices,
such as a hoist, and have an adequate number of
personnel to move the frame to the installation site.
• Avoid jarring or tilting the frame while moving it.
• When the fully assembled unit has been moved to
the installation location:
– Mark the location of the mounting foot holes on
the floor.
– Move the frame out of position by rotating it to
the side.
– Drill anchor mounting holes and insert anchors
at all marked foot hole locations.
– Rotate the frame back into position and install
frame mounting bolts through the frame feet.
3A5416E
13