Operation
12
3A4587B Operation, Repair, Parts
Startup
1. Perform Pressure Relief Procedure. See
Grounding
Procedure (For Flammable Materials Only)
, page
8.
2. Place siphon tube set in grounded metal pail partially
filled with flushing fluid. Attach ground wire to pail and
to true earth ground. Use water to flush water-base
paint and mineral spirits to flush oil-base paint and
storage oil.
3. Turn prime valve down.
4. Turn pressure control counterclockwise to lowest
pressure.
5. Set pump switch to OFF.
6. Start Engine.
a. Move fuel valve to open.
b. Move choke to closed.
ti27613a
ti6254b
ti6256b
ti5696b
ti27616b
ti30490a