Installation
3A1451C
7
4.
Open all dispense position shut-off valves (B, F
IG
. 8)
and start the pump to pressurize the system. See
Operation, page 11, for proper operation of meter.
•
To ensure dispensing accuracy, purge all air
from the fluid lines and dispense valve before
you use it.
•
Set the system flow to the desired flow rate,
which is typically 1.5 gpm. Do not exceed a
5-gpm flow rate.