Setup
Step 8 - Basic Setup
8-2 Adjust the Hoop so the top of the Front Long
Rail and the Sewing Machine Needle Plate are level
by loosening the M6 x 10mm Set Screws, pushing
in on the Hoop Adjustment Take-Up Levers and
raise or lower the Hoop. Tighten the M6 Set Screws
when finished.
Leveling Foot
Hoop Adjustment
Take-Up Lever
M6 x 10mm Set Screw
Front Long Rail
Needle Plate
Lower table
Raise table
Tools Needed:
3mm Allen Wrench
10mm/13mm Box End Wrench
14mm/17mm Box End Wrench
8-1 Adjust the Leveling Feet to level the frame and
make sure it is stable. Adjust so the Carriage and
Machine do not move on their own.
8-3 Slide the Bungee Mounts onto the Bungee
Mount Holder.
Bungee
Mount Holder
Bungee Mount
Bungee Mount (4)
Parts Needed:
10
Summary of Contents for Q-Zone Hoop-Frame PRO
Page 27: ...22 Notes ...