![Grace Q-Zone Hoop-Frame PRO Assembly Instructions Manual Download Page 18](http://html.mh-extra.com/html/grace/q-zone-hoop-frame-pro/q-zone-hoop-frame-pro_assembly-instructions-manual_2249759018.webp)
10-1 Find the center on your Back Rail Cloth Leader and Front Rail Cloth Leader and mark it. Find
the center on your Backing on both the top and bottom edges. Lay the quilt sandwich with the quilt-
top face down on a clean surface.
10-2 Match the center of each Cloth Leader with each center mark on the Backing and pin or baste
from the center out to the end of the leader on both sides. Be sure there are no gaps between the
pins.
10-3 Roll up your quilt sandwich starting from the bottom, leaving about a foot unrolled.
10-4 Carry the quilt to the machine and slide the unrolled portion under the needle and hopping
foot, and over the top of the back rail in the throat of the machine.
10-5 Use the machine to assist with fabric positioning and alignment. Roll the sewing machine on the
carriage as far back as you can. Then position the fabric so that the Quilt Top edge is approximately
1 inch away from the needle. While gliding the sewing machine across the frame check that the Quilt
Top continues to be 1 inch away from the needle.
Step 10 - Fabric Installation
Bungee Clamp
Assembly (4)
Parts Needed:
Fabric Clip (3)
Front Fabric Clip (2)
Side Fabric Clip (2)
Bungee Stop (4)
Leader Cloth Set
13
Summary of Contents for Q-Zone Hoop-Frame PRO
Page 27: ...22 Notes ...