Series 580 TCD Gas Chromatograph
September 2017, Rev. 5
47
g. Leak Check Procedure
Locate the column inlet ports on the DETECTOR HOUSING.
Hook up CARRIER GAS to one INLET PORT.
Connect the OUTLET PORTS together using clean plastic tubing. Then block the
second INLET PORT to pressurize the detector (30 psig max.)
With CARRIER GAS fl owing, check for leaks around the bushings.
If leaks occur, correct by tightening.
Turn “OFF” the CARRIER GAS and disconnect from DETECTOR HOUSING.
6. Replace Detector
To replace the detector, go in reverse order of Step #3, a-n above, and leak test the system.
NOTE
)
Make sure that the TEMP. CONTROL SENSOR (1/8” x 1” ceramic)
is properly installed in the small hole in the DETECTOR HOUSING
bottom. This is only held in place by the insulation.
B. Columns
NOTE
)
When ordering new columns, please specify the instrument model
number and serial number; whether the column is for side “A”
or “B”; length, diameter, material, liquid phase, % loading, solid
support, and mesh size.
1. Supplied Column
Care should be exercised to ensure that the column is not used below 30 °C or above
the maximum temperature indicated on the column tag.
This column has been preconditioned.
2. Availability (Packed and coiled for installation)
GOW-MAC supplies columns for all it’s GCs. Column materials include stainless steel or
copper (1/4” or 1/8”) or glass (6 mm o.d. x 2 mm o.d.). Columns may also be ordered empty.
GOW-MAC Instrument Co.
277 Brodhead Road
Bethlehem, PA 18017 USA
Tel: (610) 954-9000
Summary of Contents for 580 series
Page 2: ...GOW MAC Instrument Co 2 ...
Page 6: ...GOW MAC Instrument Co 6 ...
Page 8: ...GOW MAC Instrument Co 8 ...
Page 10: ...GOW MAC Instrument Co 10 ...
Page 24: ...GOW MAC Instrument Co 24 ...
Page 36: ...GOW MAC Instrument Co 36 ...
Page 42: ...GOW MAC Instrument Co 42 ...
Page 54: ...GOW MAC Instrument Co 54 ...
Page 62: ...GOW MAC Instrument Co 62 ...
Page 66: ...GOW MAC Instrument Co 66 ...
Page 68: ...GOW MAC Instrument Co 68 ...