
24
GMC-I Messtechnik GmbH
B Prerequisites for Software-Update or Exchange of Data
➭
Find the interface to which the
PROFITEST 204+
is connected.
Note
Always start this function first,
before performing an update
or changing report templates.
After starting this function, WinProfi loads the report files
specifically necessary for the connected instrument.
Due to the fact that WinProfi has been created for use
with several types of test instruments, incorrect test
reports may otherwise be loaded, or erroneous options
may be made available.
➭
Query information regarding current software version.
C Transmitting a Software Update to the Test Instrument
!
Attention!
Previously saved data are lost during the updating procedure.
Save the measured values to your PC before.
➭
PC:
Select
Update all
from the
Update
menu. Follow the instruc-
tions which appear at the monitor.
Depending upon the utilized PC, updating takes from 1 to 2 minutes.
The green LED indicates that the instrument is ready to receive data.
If the PC and the test instrument are correctly synchronized, the yel-
low LED lights up and the green LED goes out. The red LED lights up
during programming sequences. After transmission has been com-
pleted, the LED goes out and the instrument is restarted.
The message “Transmission done” appears at the PC.
!
Attention!
The instrument may not, under any circumstances, be
switched off during transmission, nor may the connec-
tion to the PC be interrupted!
• Subsequently select „Language“ (loading the respective lan-
guage), if applicable.
Summary of Contents for PROFITEST 204
Page 75: ...GMC I Messtechnik GmbH 75 ...