5/4 X 10"
ROOF PEAK
SUPPORTS
1-1/2" WOOD SCREW
STEP 56: UPPER LEVEL ROOF PEAK SUPPORTS
1: PRE-DRILL HOLES IN THE FOUR 5/4 X 10" ROOF PEAK SUPPORTS TO THE PATTERN SHOWN BELOW WITH A 1/8"
DRILL BIT.
2: PLACE TWO OF THE 5/4 X 10" ROOF PEAK SUPPORTS AGAINST THE ANGLED ROOF SUPPORTS AND UNDERNEATH
THE ROOF BOARDS. FASTEN THE ROOF PEAK SUPPORTS TO THE ANGLED ROOF SUPPORTS WITH 1-1/2" WOOD
SCREWS.
92