05 System Installation
09
User Manual V1.0-2022-02-18
5.3 Battery System Installation
Notice
•
Make sure that the ground is flat and no inclination.
•
Put the base cling to the floor vertically.
• Put all the base cling to the wall, and the arrow points outward.
• Put all the batteries cling to the wall, and the arrows point outwards.
• Align the holes of the upper and the lower Battery Modules when placing the upper
Battery Module.
• Put the bracket cling to the wall.
• Watch out for Battery Modules dropping.
• Do not install the two locking brackets on one side.
Step1:
Take the Battery Module, the Base and the PCU out.
Step2:
Install the locking bracket to the base.
Step3:
Place the base cling to the wall and mark the drilling positions. Then move the base.
Step4:
Drill a hole in the floor, Diameter 10mm and depth 80mm.
Step5:
Screw the expansion bolts to fix the Base. Tightening torque: 10N·m.
Step6:
Place the Battery Module on the base.
Step7:
Repeat step 1 and 2 to install the second to fifth battery modules from bottom to top.
Step8:
Install the locking bracket.
Step9:
Put the PCU above the installed Battery Module securely. Mark the drilling hole using a
marker, then remove the PCU.
Step10:
Drill a hole in the wall, Diameter 10mm and depth 80mm.
Step11:
Screw the expansion bolts to fix the PCU. Tightening torque: 10N·m.