7
Installation and initial commissioning
29 / 86
7.3
Connect
Before connecting the machine to a power source, make sure the following:
The voltage / phase of the supply corresponds to the specifications on the motor and machine
nameplate
The existing power line must be earthed in accordance with the safety regulations
Sufficient cable size of the extension cable, H07RNF 3x2.5 mm² up to 50 m for 230V
Personal protective equipment
Protective clothing
Protective gloves
Safety shoes
Ear protection
Safety goggles
7.4
Initial commissioning and acceptance, general
The machine is delivered fully assembled. However, the cut-
off wheel and the stop angle must still be fitted. The support
legs must be folded out.
DANGER!
Risk of injury during initial commissioning or adjustment work. Therefore:
-
Before starting work, put the machine out of operation and secure it against being
switched on again. Attach warning signs!
-
Ensure that the machine does not stand on slopes or pit edges
-
Pay attention to a straight underground
-
Ensure adequate lighting
-
Keep the environment clean and free from objects and lines
-
Ensure that no unauthorised persons are present in the machine area
NOTE!
With a cable length >50m there may be a loss of performance on the machine!
Summary of Contents for Bridge Saw
Page 2: ...2 86 ...
Page 31: ...7 Installation and initial commissioning 31 86 ...
Page 51: ...12 Spare parts list 51 86 12 3 3 Frame cpl ...
Page 53: ...12 Spare parts list 53 86 ...
Page 55: ...12 Spare parts list 55 86 12 3 4 Water sump cpl ...
Page 57: ...12 Spare parts list 57 86 12 3 5 Guide bridge cpl ...
Page 59: ...12 Spare parts list 59 86 ...
Page 63: ...12 Spare parts list 63 86 12 3 8 Cutting head mounting cpl ...
Page 65: ...12 Spare parts list 65 86 12 3 9 Cutting head cpl ...
Page 67: ...12 Spare parts list 67 86 12 3 10 Protection cover cpl ...
Page 69: ...12 Spare parts list 69 86 ...