Global Mainstream Dynamic Energy Technology Ltd.
- 15 -
User Manual
Powervortex 5200TL hybrid inverter
2. Turn off AC Breaker K-inv at grid side
3. Switching off the DC switch
4. Wait at least 15 minutes before repairing or maintenance
5. Disconnect the connecting cables with the inverter and then move the inverter to a suitable
place for later maintenance.
3.2 Unpacking
3.2.1 Unpacking the Device
All Powervortex 4600 / 5200TL are thoroughly tested and inspected before they’re packed and
transported. Although they’re shipped in reliable package, damage however still occurs during
transportation.
It is important to carefully inspect the shipping packaging prior to beginning the installation. If
any external damage to the packaging makes you suspect the Powervortex 4600 / 5200TL Lit
could be damaged or if you find that the Powervortex 4600 / 5200TL is damaged after
unpacking it, report the damage immediately to your distributor or the goods forwarder that
delivered the Powervortex 4600TL / 5200TL.
If it becomes necessary to return the Powervortex 4600 / 5200TL, please use the original
packages in which they were delivered.
The Powervortex 4600TL /5200TL weights 25kg. To avoid injury, take the device at the two
holding grips that are visible on the side and take the device outside the package. Ensure a
second person to assist in the unpacking and installation of the devices.
Figure 5 Unpacking the Powervortex4600TL /5200TL with 2 holding grips
3.2.2 Packing List
After unpacking the package of GMDE the Powervortex4600TL /5200TL, please check that if the
related devices, accessories and materials are available in the packages. The following are
packaging list: