background image

Global Mainstream Dynamic Energy Technology Ltd.                                                 

 

- 42 -

 

 

User Manual   
Powervortex 5200TL hybrid inverter 
 

E22 

PV inverter bus voltage is too low. 

Wait 

until 

the 

controller 

has 

re-stabilized. 

E23 

PV inverter Bus voltage is too high. 

Wait 

until 

the 

controller 

has 

re-stabilized. 

E24 

Different  value  between  master  and 
slave for grid frequency. 

Check  system  frequency  and  line 
voltage.  Contact  the  Service  if 
system  frequency  is  within  normal 
range. 

E25 

Boost current is over the tolerable value.  Restart system 

E26 

Battery  Manager  input  voltage  is  too 
high 

Re-confirm battery input voltage 

E27 

Battery Manager over temperature 

Waiting for Battery Manager cooling 
down 

E28 

Battery Manager boost current warning 

Re-start Battery Manager 

E29 

PV inverter fan locked 

Check fan 

E30 

Battery Manager fan locked 

Check fan 

E31 

PV inverter GFCI fault 

Re-start  PV  inverter,  contact  the 
service if continue occur 

E32 

PV inverter current-sensor fault 

Re-start  PV  inverter,  contact  the 
service if continue occur 

E33 

PV  inverter  current  is  over  the  tolerate 
value 

Re-start  PV  inverter,  contact  the 
service if continue occur 

E35 

PV inverter Bus fault 

Re-start  PV  inverter,  contact  the 
service if continue occur 

E40 

PV inverter relay fault 

Re-start  PV  inverter,  contact  the 
service if continue occur 

E41 

Communication  failure  between  PV 
inverter and Battery Manager   

Check 

communication 

cable 

between  PV  inverter  and  Battery 
Manager 

E42 

Communication  failure  between  PV 
inverter and energy meter 

Please check the energy meter and 
communication line status 

E43 

Communication failure between PV and 
BMS 

Please 

check 

BMSand 

communication line status 

E46 +N 

Battery (2+N) over voltage warning 

Re-start battery 

E47+N 

Battery (2+N) low voltage warning 

Re-start battery 

E48+N 

Battery  (2+N)Charge  Over  Current 
Warning 

Re-start battery 

E49+N 

Battery  (2+N)  discharge  Over  Current 
Warning 

Re-start battery 

E50+N 

Battery  (2+N)Discharge  Temperature 
Warning 

Re-start battery 

E51+N 

Battery  (2+N)  Charge  Temperature 
Warning 

Re-start battery 

Summary of Contents for Powervortex4600TL

Page 1: ...Global Mainstream Dynamic Energy Technology Ltd 1 User Manual Powervortex 5200TL hybrid inverter User Manual 1 Phase PV Storage Hybrid Inverter For Powervortex 5200TL...

Page 2: ...cription 9 2 1 General System Description 9 2 2 Device Physical Description 11 2 3 Outside Dimension of the Device 12 2 4 Technical Data 12 3 Installation 13 3 1 Operation Sequence 13 3 2 Unpacking 15...

Page 3: ...tion Lights 23 4 1 3 LCD Display Definition 23 4 1 4 LCD Display Menu Definition 24 4 1 5 LCD Setting Menu 24 4 2 WiFi 36 4 2 1WiFi Function 36 4 2 2 WiFi Configuration 37 5 Troubleshooting 40 5 1 Saf...

Page 4: ...6 21 60710806 service global mde com Legal Disclaimer All information in this documentation has been compiled and checked with most care Despite of this errors or deviations cannot be completely exclu...

Page 5: ...tion If you are reading the electronic version of the manual please note that you can click the content to find information you want quickly All the characters which contain underline are clickable A...

Page 6: ...injury will occur Warning Death or severe personal injury may occur Caution Personal injury or material damage may occur Explanations Electric Shock Do not open the device Dangerous voltage may still...

Page 7: ...sconnecting for maintenance Note that after disconnecting the hybrid inverter from AC grid PV panels and battery packs wait at least 15 minutes before proceeding Operating the product Do not commissio...

Page 8: ...f any kind any loss or damage to property any personal injury any damage or injury arising from or as a result of misuse or abuse or the incorrect installation integration or operation of the product...

Page 9: ...self use up to 70 Energy meter Adopt the 1 phase bi directional energy meter for communication and hybrid inverter controls when to charge discharge according to the data from the meter Solution Integ...

Page 10: ...if PV power plus battery discharging power is smaller than the load power then the grid co supply energy to the load together with the system 2 Time of Use Mode Peak Shaving 6AM 12AM 6PM 2AM 8AM 10AM...

Page 11: ...5 6 Figure 2 GMDE Powervortex 4600 5200TL 1 320x240 pixels display screen on which the operation related information can be displayed 2 The GMDE hybrid inverter provides multiple communication choices...

Page 12: ...W 4600 5200 VMAX PV Vdc 580 580 ISC PV A 2 18 8 2 18 8 MPP Voltage Range VMPP Vdc 125 550 125 550 Max Input Current A 2 15 2 15 MPP Full Power Voltage Range Vdc 153 550 173 550 Input DC Operating Vol...

Page 13: ...power 3 3 Acoustic Noise dB 55 55 Overvoltage Category OVC OVC III OVC III SYSTEM Type of inverter Transformerless Transformerless MPPT tracking 2 Strings 2 Strings Protective Class I I Enclosure Prot...

Page 14: ...ording to section 3 4 2 4 Connect battery wiring according to section 3 4 2 5 Connect AC wiring Load Grid according to section 3 4 3 CAUTION Battery interface must be connected and locked when the sys...

Page 15: ...g makes you suspect the Powervortex 4600 5200TL Lit could be damaged or if you find that the Powervortex 4600 5200TL is damaged after unpacking it report the damage immediately to your distributor or...

Page 16: ...ng list Item Description A Powervortex4600TL 5200TL B Connector for Battery x 1 C Aviation Plug Female for AC grid connection x 1 D Aviation Plug Male Connector for AC load connection x1 E Wall Bracke...

Page 17: ...tical and can carry the weight of the devices 3 Install the Powervortex4600TL 5200TL in a location that maintains an ambient air temperature that is less than 40 C The Powervortex4600TL 5200TL may red...

Page 18: ...f illustration Inverter weight and dimensions are listed as follows Mechanical Description Model Powervortex4600TL 5200TL Dimension 610mm x 550mm x192mm Weight 25 kg Table 3 Information of GMDE Powerv...

Page 19: ...n the suitable horizon direction 3 Make the hook on wall bracket inserting in the slot behind inverter 4 Keep the inverter down slowly to ensure the inverter hang on the hook 5 Check the inverter secu...

Page 20: ...MC4 terminals from PV panels into the positive and negative terminals of PV1 PV2 as shown in Figure 12 respectively PV1 PV2 GRID LOAD WIFI CAN RS485 Ethernet BAT SET DRED Figure 12 PV connection PV in...

Page 21: ...nection GRID connection Similarly the LOAD AC output terminal is also equipped with aviation plug Insert male connector from the important load into the female connector LOAD on the Powervortex 4600TL...

Page 22: ...Figure 17 RJ45 plug pins allocation Pin No Illustration 1 2 3 Data 4 GND 5 GND 6 Data 7 5V 8 5V Table 4 RJ45 plug pins illustration 4 System Settings 4 1 LCD 4 1 1 LCD Interface All information relat...

Page 23: ...n PV operation light Light on when hybrid inverter system is running smoothly Battery operation light Light on if the communication between PV inverter and Battery manger is fine WiFi operation light...

Page 24: ...nt AC GRID voltage on grid GRID voltage on grid EMERGENCY LOAD voltage off grid EMERGENCY LOAD current off grid TEM PV side temperature Battery DCDC side temperature FRE Grid frequency ET1 Daily PV pr...

Page 25: ...BVH Battery charging stop voltage default 0054V BVL Battery discharging stop voltage lithium default 0046V lead acid default 0047V Id Max discharging current default 0050A Ic Max charging current def...

Page 26: ...tton to enter into time setting as Figure 22 showed and choose different information by pressing buttons Users can press ESC button to quit from setting and enter into the display menu 4 1 5 2 Setting...

Page 27: ...e default battery type is lithium ion press OK button and input the corresponding battery type code to modify Press OK to finish the setting and you will enter the setting interface as shown in Figure...

Page 28: ...etting Battery Discharging Cut off Voltage Figure 25 discharging cut off voltage setting BVL refers to battery discharging cut off voltage with setting range from 40V to 60V Default BVL value is 46V f...

Page 29: ...the battery recommended value of different battery types Press OK to finish this setting and you will enter the setting interface as shown in Figure 4 1 5 7 Setting Battery Maximum Charging Current Fi...

Page 30: ...Please finish this setting according to the local grid connection regulations Press OK to finish this setting and you will enter the setting interface as shown in Figure 4 1 5 9 Setting PV String Conn...

Page 31: ...rs to operation mode The MDE code 00refers to self use mode 01 refers to time of use mode The default value is 00 and press OK to modify it If modify MDE value into 01 as shown in Figure press OK the...

Page 32: ...logy Ltd 32 User Manual Powervortex 5200TL hybrid inverter Figure 31 Time of use mode setting Figure 32 Charging time range setting under time of use operation mode Figure 33 Discharging time range se...

Page 33: ...gure 34 Energy meter address setting ADR refers to energy meter address Please check the address column on energy meter label you will find the meter address is 003 Press OK and change the meter addre...

Page 34: ...ting and you will enter the setting interface as shown in Figure 36 Figure 36 Lithium ion BMS code setting BMS refers to the BMS code when adopting different lithium ion battery in the system If in Se...

Page 35: ...attery when the battery capacity is reduced to 15 The SOC default value is 15 please press OK to modify it 4 1 5 15 Setting Feed in Grid Percentage Figure 38 Feed in grid percentage setting FED refers...

Page 36: ...r the display menu Note The setting should be operated when the Powervortex4600TL 5200TL is under wait status otherwise the E05 error might occur to the system 4 2 WiFi 4 2 1WiFi Function Powervortex...

Page 37: ...GMDE_XXXXXXXX XXXXXXXX part is the Monitor SN as shown in figure below Figure 41 Powervortex 4600TL 5200TL Wifi network Note in this step above the most important thing is to power on the inverter and...

Page 38: ...phone or PC normally connects with Input your Wi Fi password into the Key table Don t input MDE as MDE is the WiFi Name in our office and be input as an example Save your setting and restart wait at l...

Page 39: ...ey in Username password e mail address and monitor SN Please notice the Monitor SN is the Suffix of the GMDE_XXXXXXXX For example if the Wifi of one device is GMDE_3E227BB2 then the Monitor SN you sho...

Page 40: ...takes around15 minutes Caution Danger from inadequate grounding An inadequate grounding conductor connection can cause serious injuries to persons and damage to properties Note 1 Make sure that the AC...

Page 41: ...ut of tolerable range Re measure line voltage contact the service if grid voltage is within normal range E11 The master frequency is out of tolerable range Check system frequency and line voltage Cont...

Page 42: ...V inverter current sensor fault Re start PV inverter contact the service if continue occur E33 PV inverter current is over the tolerate value Re start PV inverter contact the service if continue occur...

Page 43: ...cked against reactivation until the fault is acknowledged The fault can only be acknowledged after the cause of the fault has been eliminated To acknowledge the fault messages press the ESC key or tur...

Reviews: