Global Mainstream Dynamic Energy Technology Ltd.
- 20 -
User Manual
Powervortex 5200TL hybrid inverter
same AC Bus)
4. One AC Load connector (L1/N/G), which can connect to the emergency load
5. 1 pairs of Battery input terminals.
*Definition of Loads:
Emergency load: the load that continues to be powered when the grid failure happens.
Other load: is connected on the AC grid side, stop working when the grid failure happens.
3.4.2 DC Connection
DC Connection procedure is shown in the following steps:
1. Switch off the DC Switch on the Powervortex 4600TL / 5200TL before connection;
2. Insert the MC4 terminals from PV panels into the positive and negative terminals of PV1, PV2
as shown in Figure 12 respectively.
PV1
PV2
GRID
LOAD
WIFI
CAN
RS485
Ethernet
BAT
SET
DRED
Figure 12 PV connection – PV input terminals
3. Connect the red connector (positive) and the blue / black connector (negative) from the
battery packs with the BAT connectors as shown in Figure 12 respectively. The battery interface
must be connected and locked when the system running.
3.4.3 AC Connection
There is one AC output terminal to the grid and one AC output to the Load as shown in the
following figure:
GRID
LOAD
Figure 13 AC output terminals
1. The “GRID” AC output terminal is equipped with aviation plug.
2. Insert male connector from the grid into the female connector “GRID” on the Powervortex
4600TL / 5200TL.