Page
•
globalcontract.com
3
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
STEP 1: Open the clamps.
STEP 2: Remove the pin.
STEP 3: Measure 5” from the edge.
STEP 4: Drill directly into the top of the panel. (use the provided #10 1 1/2” pan head
square drive type A screw.)
STEP 5: Use the thicker rubber pad if two different size pads are provided in the box.
STEP 6: Leave the clamps loose, carefully slide the glass in and then tighten both
clamps evenly so the glass is snug and vertical. the middle set screw will control the
pitch.
CAPAS Privacy Glass
1
2
3
4
5”
5
6
6