
Page
•
globalcontract.com
19
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
1
2
Accessory Retainer
STEP 1: Mount the accessory on the load bar.
STEP 2: Push the accessory retainer (1) into the gap above the accessory (2) to
lock it into place.
3” black rubber retainer for use with
paper management accessories.
This locks and prevents accessories
from falling off the load bar.