background image

•Page

 

globalcontract.com

20

• Summer 2017

GLOBAL

Contract

Summary of Contents for Compile

Page 1: ...n Manual Visit us on the Internet at globalcontract com 416 739 5000 ISO 9001 2015 OHSAS 18001 2007 ISO 14001 2015 Global Contract Inc 565 Petrolia Road North York Ontario M3J 2X8 Compile 2017 REVISED...

Page 2: ...with the manufacturer s policy of continual product improvement the product presented in this document is subject to change without notice or obligation Please contact your Global Contract Service Rep...

Page 3: ...anel even if it s on an angle Using a mallet and a flat screwdriver hammer the lock clip down until you feel it catch the lower screw Between Panels b Put the lock clip in such a way that the short en...

Page 4: ...o the top of the panel use the provided 10 1 1 2 pan head square drive type A screw STEP 5 Use the thicker rubber pad if two different size pads are provided in the box STEP 6 Leave the clamps loose c...

Page 5: ...sides with two small black screws Electrical Adding Power Distribution Housing Align Power Distribution Housing so the bottoms tabs drop into the pre cut slots in the panel base Be sure to align the s...

Page 6: ...e the embossed N should be pointing up STEP 2 Slide Duplex into place until it clicks firmly into place Power Distribution Harness has two ports on each side to plug in additional Jumpers or Ceiling F...

Page 7: ...ceiling THESE ARE GUIDELINES ONLY ACTUAL NUMBERS MAY VARY BASED ON SITE CONDITIONS AND CLIENT REQUIREMENTS With Power Pass Through Cable Power Feed 0 73 dia Post Panel Frame Without Power Pass Through...

Page 8: ...ace STEP 1 Orient Raceway Cover until it is almost VERTICAL and insert top of cover into groove on panel STEP 2 Raceway Cover can be lifted up at 90 degrees and pushed slightly into panel to lock in p...

Page 9: ...Gauges are provided with every cantilever and corner bracket Mid Span Support Brackets Can ONLY be used with Segmented Panels STEP 1 Insert bottom portion of Mid Span Support bracket into segmentatio...

Page 10: ...er 2017 GLOBALContract INSTALLATION GUIDELINES CHMEG Metal End Gable STEP 1 Engage the leg into the panel s rail by rotating it into place STEP 2 Install the worksurface while making sure the leg is p...

Page 11: ...GUIDELINES Centre Mounted Overhead 1 Install the corner brackets so they align with the very top of the panel 2 Measure and centre the overhead on top of the panel 3 While someone holds it in place f...

Page 12: ...drilling countersunk head screws Not shown STEP 4 Angle the pedestal on the floor and insert bracket ends into panel s vertical side groove STEP 5 Rotate the pedestal while making sure that both brack...

Page 13: ...ead side support with top of panel STEP 3 Securely attach all screws using a 4 ALLEN BIT or TORX T25 HEAD BIT STEP 4 Place bottom shelf on top of bottom brackets STEP 5 Securely attach all screws usin...

Page 14: ...ed shelf gauge STEP 3 Securely attach all screws using a 4 ALLEN BIT or BALL TORX T25 BIT on one side only STEP 4 Securely attach ONE screw using a 4 ALLEN BIT or BALL TORX T25 BIT on second side only...

Page 15: ...g tackboard hooks into notches on universal bracket Load Bar STEP 1 Attach universal brackets with connection plate and screws attached into groove on back of Load Bar STEP 2 Attach end caps to both s...

Page 16: ...meet with the 2 hole sliders already installed STEP 1 Insert the crowbar under the bottom of the vertical and lift until the con nectors at the top disengage STEP 2 Repeat the above step and release...

Page 17: ...and replace with new fabric one STEP 4 Screw back all the vertical side and 2 bottom screws STEP 5 Drop down one side of the panel then drop down the following side into the connectors Use clamp vise...

Page 18: ...lide the fabric module out Steps 4 and 5 are for glass modules If replacing fabric skip to step 6 STEP 4 Slide the glass out STEP 5 Carefully pry the glass frame off using a pick or a screwdriver avoi...

Page 19: ...align ing the bracket holes with the pilot holes of the end panel STEP 3 Attach the end panel to the Compile panel s vertical rail 5 Put it on an angle then rotate it into its place STEP 4 Adjust the...

Page 20: ...essory Retainer STEP 1 Mount the accessory on the load bar STEP 2 Push the accessory retainer 1 into the gap above the accessory 2 to lock it into place 3 black rubber retainer for use with paper mana...

Page 21: ...Page globalcontract com 20 Summer 2017 GLOBALContract...

Page 22: ...NTON SHOWROOM 17716 107 Avenue NW Edmonton AB T5S 1G8 TEL 780 444 8922 CALGARY SHOWROOM 302 237 8 Avenue SE Calgary AB T2G 5C3 TEL 403 250 7770 WINNIPEG SHOWROOM 1 1080 Waverley Street N Winnipeg MB R...

Reviews: