•Page
globalcontract.com
16
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Chicago J-Box
Core Replacement
STEP 1: Insert the crowbar under the bottom of the vertical and lift until the con-
nectors at the top disengage. Repeat for the other side and release the panel from
the row.
STEP 2: Unscrew both side verticals and the bottom 2 screws
STEP 3:Slide out the core and replace with new fabric one.
STEP 4: Screw back all the vertical side and 2 bottom screws
STEP 5: Drop down one side of the panel then drop down the following side into
the connectors. (Use clamp vise grips to bring the panels close to each other
while the drop down panel is raised above the connectors.)
2
1
3
2
5
STEP 1: Insert the bottom bracket into the power distribution slot.
STEP 2: Insert the top bracket into the inner groove and place it in front of the
bottom bracket.
STEP 3: Take the Junction Box and attach it to the two brackets with supplied hex
screws.
3