background image

Page 4

Page 5

  Technical

M

odel

Ener

gy E

fficienc

y C

lass

H

ea

t L

oss

Domestic 

H

ot W

at

er V

olume

W

eigh

t - Empt

y

W

eigh

t - F

ull

O

ver

all H

eigh

t

(Ex

cluding 

F&E T

ank)

O

ver

all D

iamet

er

(A

llo

w additional 150mm f

or PHE)

Cold F

eed

Sealed P

rimar

y

Boiler C

oil F

lo

w

Sealed P

rimar

y

Boiler C

oil Return

Solar C

oil F

lo

w

Solar C

oil Return

Cen

tr

al H

ea

ting F

lo

w

Cen

tr

al H

ea

ting Return

Cylinder D

rain

Solid F

uel F

lo

w

Solid F

uel Return

O

pen V

en

ted

Boiler F

lo

w

O

pen V

en

ted

Boiler Return

O

pen V

en

t

Sur

fac

e A

rea of

Primar

y H

ea

ter C

oil

Sur

fac

e A

rea of

Solar H

ea

ter C

oil

Capacit

(T

otal V

olume)

Dedic

at

ed 

Solar V

olume

M

aximum 

H

ot W

at

er

Flo

w R

at

e

watts

litres

kg

kg

 A

mm

mm

B

mm

C

mm

D

mm

E

mm

F

mm

G

mm

H

mm

I

mm

J

mm

K

mm

L

mm

M

mm

N

mm

m

2

m

2

litres

litres litres/min

Torrent Stainless

OV

TST150OV

B

47

141

32

180

1118

550

285

n/a

n/a

n/a

n/a

614

220

220

614

223

651

220

1177

n/a

n/a

148

n/a

26.5

TST180OV

B

55

169

36

214

1306

550

285

n/a

n/a

n/a

n/a

665

220

220

665

223

732

220

1365

n/a

n/a

178

n/a

26.5

TST210OV

B

62

198

39

247

1494

550

285

n/a

n/a

n/a

n/a

710

220

220

710

223

828

220

1553

n/a

n/a

208

n/a

26.5

TST250OV

C

74

236

44

292

1744

550

285

n/a

n/a

n/a

n/a

783

220

220

783

223

939

223

1803

n/a

n/a

248

n/a

26.5

TST350OV

C

79

328

54

399

1765

630

285

n/a

n/a

n/a

n/a

690

218

218

690

221

896

221

1826

n/a

n/a

345

n/a

26.5

Torrent Stainless

OV SOL

TST150OVSOL

B

47

141

34

182

1118

550

285

n/a

n/a

405

235

838

427

220

838

430

804

504

1177

n/a

0.78

148

63.9

26.5

TST180OVSOL

B

55

169

38

216

1306

550

285

n/a

n/a

405

235

838

427

220

838

430

804

504

1365

n/a

0.78

178

73.8

26.5

TST210OVSOL

B

62

198

42

250

1494

550

285

n/a

n/a

515

235

1015

537

220

1015

540

1071

611

1553

n/a

1.27

208

83.7

26.5

TST250OVSOL

C

74

236

47

295

1744

550

285

n/a

n/a

515

235

1040

537

220

1040

540

1441

761

1803

n/a

1.27

248

96.9

26.5

TST350OVSOL

C

79

328

57

402

1765

630

285

n/a

n/a

498

218

971

520

218

971

523

1446

676

1826

n/a

1.27

345

129.9

26.5

Torrent Stainless

SP SOL

TST150SPSOL

B

47

141

36

184

1118

550

285

804

504

405

235

838

427

220

838

430

n/a

n/a

1177

0.78

0.78

148

63.9

26.5

TST180SPSOL

B

55

169

41

219

1306

550

285

804

504

405

235

838

427

220

838

430

n/a

n/a

1365

1.27

0.78

178

73.8

26.5

TST210SPSOL

B

62

198

45

253

1494

550

285

1071

611

515

235

1015

537

220

1015

540

n/a

n/a

1553

1.27

1.27

208

83.7

26.5

TST250SPSOL

C

74

236

51

299

1744

550

285

1441

761

515

235

1040

537

220

1040

540

n/a

n/a

1803

1.40

1.27

248

96.9

26.5

TST350SPSOL

C

79

328

63

408

1765

630

285

1446

676

498

218

971

520

218

971

523

n/a

n/a

1826

2.50

1.27

345

129.9

26.5

DESIGN

DESIGN

TECHNICAL INFORMATION

TECHNICAL INFORMATION

Torrent Stainless SP SOL

G

D

H

J

K

C

B

E

I

F

A

N

Torrent Stainless OV SOL

G

M

H

J

K

L

B

E

I

F

A

N

Torrent Stainless OV

L

G

J

K

B

H

I

M

A

N

NOTES

1.  The diagrams shown are generic. For exact 

product specification refer to the table eg. 

the number of immersion heaters varies 

depending on model.

2.  All connections are within 120

˚.

3.  The domestic hot water volume shown is 

based on one heat up, and the store is 

fully charged to 75°C.

4. 

Domestic  hot  water  volume  shown  in 
s

olar cylinders will reduce where the solar 

input reduced or unavailable (potentially up 
to 40%).

If more detail is required, please contact our 

technical desk on 01253 474584

Summary of Contents for Torrent Stainless OV

Page 1: ...WWW GLEDHILL NET ONE NAME EVERY SOLUTION TORRENT STAINLESS OPEN VENTED STAINLESS STEEL THERMAL STORE PROVIDING HEATING AND MAINS PRESSURE HOT WATER INSTRUCTION MANUAL DESIGN INSTALLATION SERVICING ...

Page 2: ...0Vac 50Hz TheTorrent Stainless comes complete with plate heat exchanger This has a very small volume of water held within it therefore any minimal expansion will be accomodated in the supply pipe Handling Before Installation The Torrent Stainless must be handled with care and stored the correct way up in a dry place Any manual handling lifting operations will need to comply with the requirements o...

Page 3: ...7 220 838 430 804 504 1365 n a 0 78 178 73 8 26 5 TST210OVSOL B 62 198 42 250 1494 550 285 n a n a 515 235 1015 537 220 1015 540 1071 611 1553 n a 1 27 208 83 7 26 5 TST250OVSOL C 74 236 47 295 1744 550 285 n a n a 515 235 1040 537 220 1040 540 1441 761 1803 n a 1 27 248 96 9 26 5 TST350OVSOL C 79 328 57 402 1765 630 285 n a n a 498 218 971 520 218 971 523 1446 676 1826 n a 1 27 345 129 9 26 5 Tor...

Page 4: ...d Fuel ControlThermostat 22mm Dual Pocket 22 Hot water supply 22mm Compression 23 Mains cold water supply 22mm Comp Torrent Stainless SP SOL Available Components and Tappings 1 Open Vent 22mm Compression 2 Cold Feed F E tank 22mm Compression 3 Immersion Heater 1 3 4 Female 4 Solar Coil Flow 22mm Compression 5 Solar Coil Return 22mm Compression 6 Control Thermostat Pocket 22mm Dual Pocket 7 Control...

Page 5: ...available when the local demand is at its maximum but the preferred range is between 2 and 3 0 bar If the incoming static mains pressure exceeds 5 0 bar at any point in the 24 hour cycle then a pressure limiting valve set at 3 0 bar should be fitted downstream of the stop tap where the cold supply enters the dwelling If a water meter is fitted in the service pipe it should have nominal rating to m...

Page 6: ...d by the installer must be sized correctly to enabletheexpansionoftheentiresystemvolume Thiswillincludethecentralheating store solid fuel and boiler circuit volumes See page 12 for guidance sizing the feed and expansion tank Water Treatment In all Torrent Stainless models the primary i e non potable water is stored and the domestichotwaterisheatedinstantaneouslybymeansofheatexchangers Therefore tr...

Page 7: ...thiscasenobypassvalve is required unlessTRV s are used on all radiators If the flow and return pipes between the boiler and the Torrent Stainless OV thermal store are dipped as illustrated in the schematic shown opposite then the boiler selected must be suitableforasealedheatingsystemi e itmustbe fitted with an overheat thermostat Automatic air vents should be fitted at appropriate places to vent ...

Page 8: ... Stainless SP please refer to page 19 for further information Where a sealed primary coil is used the thermal store is a hot water only thermal store If too much heat is taken out of store then hot water performancewillbelimited Thehotwaterpriority should be protected by use of an appropriate thermostat Heating can be taken from the SP thermal store to provide auxilliary heating to towel radiators...

Page 9: ... the store to provide shower or a bath to utilise the heat gained by the system from the previous day s solar energy input Alternatively showering or bathing in the evening will utilise the energy that has been stored during the day from the solar system Aswithanysystem hotwaterandspaceheatingshouldbeprogrammedaccording to house holder requirements However it is always good to remember that to gai...

Page 10: ...re raises When the temperature is above pipe thermostat 1 set point the contacts close signalling the normally closed valve to move open Once it is fully open it signals the normally open valve to motor there by closing it The thermal store now receives heat from the solid fuel boiler via gravity circulation If control stat 2 set point is exceeded then the power to the normally closed valve is cut...

Page 11: ...2 c c 230Vac 50HZ Mans supply L N Bottom store thermostat Top store Thermostat 2 Pole CO relay 230Vav coil NC NO NC NO L N Heat source Control supply C Common contact C Common C 1 Close on temperature rise NO normally open C 2 Close on temperature drop NC normally closed Figure 8 1 Example of twin thermostat control circuit wiring for thermal stores WA Specification for thermal stores 2010 Final v...

Page 12: ...sensors S1 and S2 In this case the mechanical overheat thermostat S3 shown in this diagram is not required and the solar pump is wired straight to the solar controller NOTE As part of system setup and commissioning it is important that this boiler hold off pipe thermostat be adjusted to find the best setting for each individual installation Failure to do so will give under performance of either th...

Page 13: ...which is wired directly to the solar controller same as sensors S1 and S2 In this case the mechanical overheat thermostat S3 shown in this diagram is not required and the solar pump is wired straight to the solar controller Normally Closed 2 Port Valve E N SL PL ML Pipe Thermostat 1 1 C 2 on off NOTE As part of system setup and commissioning it is important that this boiler hold off pipe thermosta...

Page 14: ...rom over heating by stopping the solar Pump at pre set temperature limit S1 S2 S3 E N R1 N R1 N L 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 Solar controller N L E 1 2 3 Normally Closed 2 Port Valve E N SL PL ML Pipe Thermostat 1 1 C 2 on off NOTE As part of system setup and commissioning it is important that this boiler hold off pipe thermostat be adjusted to find the best setting for each indivi...

Page 15: ...t the hot tap does not indicate that the TorrentStainlessisfull Checkthatthereiswaterinthefeedandexpansiontankbefore switching on the immersion heaters Dry firing the elements will cause premature failure which is not covered by our warranty Non Electric Torrent Stainless Models Opentheincomingstopvalveandfillthedomestichotwatersystem Foropenvented heating system fill the whole of the primary heat...

Page 16: ...ling prior to switching the electricity supply to the PWM controller PCB If there is no water in these pipes then there may be significant wear on the PWM pump This can be confirmed by Checking the thermal store pipework servicing valves are open Looseningtheconnectionpointsonthethermalstorepipeworkinasystematic manner and checking for water presence Confirming that the feed and expansion tank has...

Page 17: ...tion in this procedure is that the plumbing and water supply is working effectively If in doubt please confirm and refer to the end of this section for advice on specific components A multi meter a weir gauge and a thermometer will be required to confirm that all the components are working effectively The PWM controller PCB manufacturer suggests Fluke 87 TRUE RMS Multi meter as a suitable product ...

Page 18: ...on Sensor required a power supply 5 VDC Open a HW tap and set to a flow rate Measure and record the frequency across terminals 1 and 12 Compare the frequency measured with chart flow rate determination The reading should make sense taking measurement conditions into consideration 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 8 1 2 1 2 3 4 5 6 7 8 9 1 10 2 3 4 5 6 J18 J20 J19 J3 J7...

Page 19: ...lure Pump restarts by itself after the fault has disappeared Under voltage U 160 V or Over voltage U 253 V Check voltage supply 195 V U 253 V Pump overheating temperature inside motor too high Check water and ambient temperature Over speed the pump rotor is driven by an external flow above the maximum allowed value Ensure that there is no other external flow other pump running on system Over curre...

Page 20: ...upply Electrically safe Components short circuited Wiring as per circuit diagram Pump LED on N Check cable connec on secure and resistance in cable Pump running LED is damaged pump replacement op onal OK Y Resolve N Electronics damaged replace pump LED Blinks red Y Y Check for blockage in pipework or pump housing N LED con nues to Blink red a er power reset Y Motor or Electronics damaged replace p...

Page 21: ...asier and should be in good health Persons below average build and strength may require more rest periods during the handling process Pregnant women should not carry out this operation Persons who are not in good health should seek medical advice prior to commencing any lifting or manual handling operation Residual risk Following the guidelines given above will reduce any risk to injury All person...

Page 22: ...Page 42 Page 43 NOTES NOTES ...

Page 23: ...se which are contained on the Invoice Forms and all Sales are now subject to these Conditions of Sale and Warranty terms only 2 PRICE Once an order or call off has been accepted the price will be held for three months but if delivery is extended beyond that period at the customer s request then we reserve the right to amend the price when necessary The company reviews its pricing annually to adjus...

Page 24: ...o Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date Engineer name Company name Telephone No Comments Signature SERVICE 02 Date Engineer name Company name Telephone No Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Comments Signature SERVICE 06 Date Engineer name Company name Telephone No Comments Signature SERV...

Page 25: ...3 474412 OR WWW GLEDHILL SPARES NET Due to a programme of continuous improvement Gledhill Building Products reserve the right to modify products without prior notice It is advisable to check the product technical detail by using the latest design and installation manuals available from our technical support team or on our website It is an offence to copy or adapt this document without consent of t...

Reviews: