![background image](http://html.mh-extra.com/html/gima/primaled-so/primaled-so_operators-manual_2228147003.webp)
Operator
’
s Manual
MO080-IT
12/09/2017
Rev.3
Page 3 of 20
The installation premises must have building code compliance. Installation on walls made of hollow bricks and
plasterboard is only allowed with the fitting of another plate on the opposite side of the wall (sandwich closing).
After making sure that the premises used for medical purposes are in conformity with the above requirements, proceed
to mechanically anchor the wall plate; determine the type of wall involved and behave consequentially.
The installer takes all responsibility, technical, civil and legal, relating to the correct and suitable preparation of the
product for anchoring and installation, which must be performed in a workmanlike manner. The scialytic lamp is
supplied complete with ceiling coupling (Bar (Tiges) + Counter-plate). The length of the bar varies according to the
height of the premises in which the lamp is installed. This is calculated to install the lamp at a height from the floor to
under the light headpiece with horizontal position of the swinging arm between 19/200 cm approx., unless otherwise
requested by the customer.
By way of example only, below is a list of some types of walls:
Reinforced concrete
:
Mechanical anchoring
Mechanical anchoring: proceed to fasten the wall plate using the 8 x
Hilti HSL-3-G M8/20 wall plugs, carefully following the indications provided by the insert manufacturers and shown
below for your better information:
Anchor
tie-rod
do
(mm)
t
(mm)
hs
(mm)
l
(mm)
Mt
(Nm)
SW
(mm)
x
(mm)
HSL-3-G M 8/20
12
80
60
98
25
13
20
do Nominal drill bit diameter
Mt
Closing bending moment
t
Minimum drilling depth
Sw
Key opening
hs Minimum insertion depth Anchor
tie-rod length
x
Fastening height
1.
Using the paper template provided and attached to this manual, mark all 8 fastening holes on the
chosen part of the wall.
2.
Make the first hole in conformity with the diameter of the wall
plug.
3.
Using a small pump or vacuum cleaner with tube end, remove any dust
and small drilling fragments from the hole.
4.
The anchor tie-rod must be made to enter the hole, keeping it
perpendicular and using a hammer.
Attention!
Take into account the insertion depth.
5.
Using the torque metre wrench, calibrated as indicated by the wall plug
manufacturer, tighten so as to open the plug.
The anchor tie-rod will immediately bear the weight.
6. Drill the remaining holes and insert the anchor tie-rods as indicated at previous points 2– 5.
7. After one hour, tighten the tie-rods again using the prescribed tightening torque.
Chemical anchoring:
drill the wall using the template as indicated above. Insert the resin inside the 8 drilled holes and
fill the hole, carefully following the manufacturer’s instructions. GIMA recommends using HILTI HIT-HY 270 resin
or similar products.
Fit 8 x M8 threaded bars into the holes. Proceed to fasten the plate with nuts and locknuts for each tie-rod and tighten
using the Allen key.
Summary of Contents for PRIMALED SO
Page 15: ...Operator s Manual MO080 IT 12 09 2017 Rev 3 Page 15 of 20 8 Wiring diagram ...
Page 21: ...Drawing code Rev Data 052 1 2 3 ...
Page 22: ...Drawing code Rev Data 053 1 2 3 ...
Page 23: ...Drawing code Rev Data 054 2 1 3 4 ...
Page 25: ...Drawing code Rev Data 056 2 1 3 4 5 ...
Page 26: ...Drawing code Rev Data 057 3 1 2 ...
Page 27: ...Drawing code Rev Data 058 2 1 3 4 ...
Page 28: ...Drawing code Rev Data 1 2 7 3 4 5 6 153 ...
Page 29: ...Drawing code Rev Data 190 1 2 3 4 5 6 8 7 ...
Page 30: ...Drawing code Rev Data 191 1 2 4 5 3 6 7 ...
Page 31: ......
Page 32: ......