dipstick and oil fill cap to facilitate complete draining 
process.  When oil is drained, replace dip stick, oil fill 

cap, oil hose drain cap and place hose in holding clip. 
 

OIL FILL:

 Replace oil with premium grade API 

SJ/10W-30 oil when ambient temperature is above 32º 

F (0º C).  When temperature is below 32º F, use a syn-
thetic premium grade, API SJ/CF5W-30W.  This syn-
thetic oil facilitates cold weather starting.  Oil level 

should reach “upper limit” level on oil dipstick.  

CAUTION:

 Too much oil can cause oil foaming, high 

oil consumption (white smoke emitting from exhaust) 
or high operating temperature.  Also, too little oil (oil 

level to, or below “lower limit” on oil dipstick) can 
cause severe engine damage. 

 

For best starting results, oil should be scheduled to 
change, using synthetic oil, just before winter season, 

in those cold climate areas.  After oil is changed, re-
place dipstick and oil fill cap. 

 

SPARK PLUG:

 Remove the plug and inspect it’s con-

dition.  Also, clean the plug threaded base and tem-

porarily cover, to keep dirt and debris from falling 
into plug hole.  Replace the plug if it is badly worn or 
in questionable condition.  

CAUTION: WHEN RE-

PLACING SPARK PLUGS, ALWAYS CHECK THE 
SPARK PLUG GAP AND RE-GAP PLUG FOR DRY 
FUEL USE, IF REQUIRED.  

Clean good plugs with a 

wire brush.  Do not sand blast or air blast the plug 

electrode.    Re-gap  existing  or  new  plug  to                
0.30 - 0.40 mm (0.012 - 0.016 in) for Honda engines, 
0.70 - 0.80 mm (0.028 - 0.032 in) for Vanguard & Su-
baru engines, by using feeler gauge and bending 

plug electrode.  Replace spark plug at recommended 
torque values.

 

 

Setting Spark Plug Gap 

for Dry Fuel Engines 

SET SPARK PLUG GAP AS SHOWN IN 

 ABOVE PARAGRAPH  

COOLING SYSTEM:

 Engines may be air cooled or 

liquid cooled with a radiator.  Inspect the debris 
guard on engine air intake to insure no obstructions 

have accumulated.  Inspect radiator (liquid cooled 
sets) to insure no debris accumulation has occurred.  
Some generator models have bug/rodent screens.  

Inspect and clean off any aluminum screens that may 
collect debris. 

EXHAUST SYSTEM:

 One end of generator set, will 

be the hot exhaust discharge.  Keep any combustibles 

(building materials, fuels, chemicals, flammables, 
etc.) away from this exhaust area.  Periodically in-
spect exhaust system components (flexible pipes, 
mufflers, clamps, etc.) for leaks, cracks, or corrosion.  

Your muffler maybe equipped with a spark arrestor 
screen, which prevents exhaust sparks from exiting 
the exhaust system.  This screen must be checked and 

cleaned, every 50-75 hours of engine operation.  

NOTE:

 Check run time meter for periods of mainte-

nance. 
 

CORROSION:

 Depending on the area of generator 

installation, will depend on the amount of attention 
given to cleanliness.  Heavy concentration of salt wa-
ter exposure will require frequent washings and a 

final waxing of housing exterior.  Salt water corrosion 
may enter the interior of generator housing, which 
must be removed by special detergents.  Every 3 

months, spray the engine governor linkage and other 
engine moving parts, and engine, generator, base 
exterior with a light coverage of WD-40 to prevent 
corrosion build-up, on these parts. 

   

Only professional generator repair person should 
clean and/or spray oil inside the generator housing. 

 

BATTERY:

 Inspection should include: 

 

 Inspect battery posts and cables for corrosion 

build-up.  Clean and tighten as required. 
 

 Have the state of charge and over all condition 

checked.  A fully charged battery should test at 12.5-
13.0 volts D.C. 
 

 See battery section on page 17 for further informa-

tion. 
 

After each maintenance repair procedure is com-

plete, remember to replace 10 amp controller fuse, 
and set controller switch to “STANDBY” position. 

CAUTION

 

CAUTION

 

Summary of Contents for SPH-120

Page 1: ...OPERATION AND INSTALLATION GUIDE FOR MODELS SPS 100 SPH 120 SPS 120 SPV 160 GILLETTE GENERATORS AUTOMATIC POWER SYSTEMS...

Page 2: ...tural Gas NG 12 13 Gaseous Dry Fuel System Liquid Propane Gas LPG 14 15 Prepare for Generator Operation 15 18 Access to Interior Battery Selection Installation Electricians Wiring Installation Final P...

Page 3: ...procedure is used and is not recommended by GILLETTE the person or company responsible for the generator modification must assume all responsibility for safety and correct operation for the operator s...

Page 4: ...AU TIONS Starting batteries are not furnished with your generator set but they are available through your installing contractor The home standby generator requires a Group 36 12 VDC fully charged batt...

Page 5: ...running engine produces a poisonous gas from its muffler exhaust pipe This is an odorless in visible and colorless poison that cannot easily be detected Breathing carbon monoxide will cause fa tigue h...

Page 6: ...ical output shows sparks smokes emits flames vibrates or shows any other abnormal operation Do not modify generator design Do not modify carburetion system as it is factory set for C A R B EPA emissio...

Page 7: ...ibility of the sepa rate manufacturers of the ATS PRE INSTALLATION PLANNING The beginning installation requires some thought and planning The following illustrations are meant to fa miliarize reader w...

Page 8: ...ther air intakes should be minimum 10 feet from exhaust end 6 Windows and doors on adjacent walls to be closed at all times during generator operation 7 Nearest roof overhang vent should be 10 feet fr...

Page 9: ...best place for these two neutrals to meet generator and utility neutral is in the auto matic transfer switch However still connect gen set mechani cal ground to the stake All factory gen sets have a...

Page 10: ...with the entire generator set 11 12 VDC battery charger Installer must connect 120 volt 1 phase utility power to this charger 12 Oil drain with flexible drain hose NOTE Change oil after every 50 hour...

Page 11: ...to normal operation C Hour Meter Total hours of use and is used as service reminder D Main Line Circuit Breaker UL 146 circuit breaker will trip open upon short circuits or overloads KNOWYOUR SYSTEM C...

Page 12: ...sure must be 6 to 8 inches water column 4 to 4 ounces and minimum 1000 BTU rating per cubic foot hour Figure 1 BTU Values based on 1000 BTU s per cubic foot Gas supplier may need to know Nat Gas consu...

Page 13: ...l new installations plus any future repair or troubleshooting procedures must include a natural gas manometer test This test should be conducted after all other natural gas appliances have been turned...

Page 14: ...135 cu ft can be de livered over a 50 ft distance with a 1 diameter fuel pipe INSTALLER S RESPONSIBILITY Use Figure 4 chart to learn cubic feet hour value of generator to be installed Use Figure 5 cha...

Page 15: ...LPG tank are reasonably close 20 Ft to 50 Ft as it results in short runs for both electric wires and LPG fuel lines When these two identities are far apart always choose to locate generator as close t...

Page 16: ...jobsite A fully charged battery must test at 12 5 13 0 volts DC Also the correct battery for models SPH 85 SPH 100 SPH 120 and SPV 160 must have lug terminals to match lug battery cables for a bolt to...

Page 17: ...tery charger before working on battery terminals A battery can cause a chemical burn Before working on a battery follow safe procedures Wear full eye protection and protective clothing When battery el...

Page 18: ...unction The generator will not ex ercise in this position TEST position will start the engine but will not dis connect utility power from the transfer switch This position is used for testing the gene...

Page 19: ...re position this LPG venture For natural gas operation remove the carburetor flexible fuel line from LP stamped brass fitting and dead end brass cap from NG stamped brass fitting Attach fuel line to...

Page 20: ...r switch ATS STEP 2 Turn the MODE SELECTOR switch located on the control panel from OFF RESET position to TEST position This will establish the first engine start cycle With the ENGINE RUNNING lamp lo...

Page 21: ...rong enough to perform under this demanding scenario However if the load is 75 or more induc tive large motors UPS systems large air condition ers it may be necessary to install a time delay de vice a...

Page 22: ...or Inspect the debris guard on engine air intake to insure no obstructions have accumulated Inspect radiator liquid cooled sets to insure no debris accumulation has occurred Some generator models have...

Page 23: ...L CONNECTION THERE ARE TWO KNOCK OUT HOLES ON THE RIGHT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT GENERATOR END VIEW CONTROL DOOR PANEL THIS PANEL IS HERE TO HELP WITH INITIAL WIRING I...

Page 24: ...POLY BASE AS SHOWN USING 5 16 18 HEX NUT TO LOCK BOLT IN PLACE INSTALL GEN SET AND METAL BASE ONTO EXTENEDED 5 16 18 BOLT AND SECURE WITH LARGE FLAT WASHER AND HEX NUT CAUTION TIGHTEN NUT ONLY TO HOLD...

Page 25: ...IS A 3 4 THREADED PIPE FOR CONNECTION ELECTRICAL CONNECTION THERE ARE THREE PLUGGED HOLES ONE ON THE RIGHT HAND SIDE AND ONE ON THE LEFT HAND SIDE OF GENERATOR END BOTH HOLES ARE FOR 3 4 CONDUIT FULL...

Page 26: ...NOT ENERGIZED GAS REGULATOR NOT OPENING SPARK PLUG IS DEFECTIVE OR SPARK PLUG WIRE IS DEFECTIVE OR DISCONNECTED VENTS IN GAS REGULATOR IS PLUGGED UP C ENGINE RUNS ERRATIC AIR CLEANER IS DIRTY AND NEED...

Page 27: ...START STOP HIGH TEMPERATURE DRY START STOP CONTACTS FROM OTHER EQUIPMENT NEUTRAL ENCLOSURE GROUND MECHANICAL GROUND LOAD SIDE 120 240 VAC AND NEUTRAL CONNECT TO TRANSFER SW GROUND STAKE FOR CONTROLLE...

Page 28: ...LINES X YEARLY FUEL LINES X YEARLY CONNECTOR JOINTS X YEARLY EXHAUST MUFFLER X EVERY 6 MONTHS SPARK ARRESTOR X EVERY 6 MONTHS FLEX LINE X EVERY 6 MONTHS LEAKAGE X EVERY 6 MONTHS JOINT CLAMPS X EVERY 6...

Page 29: ...g table to keep a record of all periodic and unscheduled maintenance and service See Ser vice Schedule Record the name address and phone number of your authorized GILLETTE service center DATE HOUR MET...

Page 30: ...5 OWN 794 20080828 Gillette Generators Inc 1340Wade Drive Elkhart IN 46514 Phone 574 264 9639 Fax 574 262 1840 E mail sales gillettegenerators com www gillettegenerators com Call for Tech Support 1 86...

Reviews: