SkyEdge II VSAT Installation and Monitoring
Figure 22: Rx Signal Optimized
12.
Click
Cross Pole Alignment
.
Result: The Cross Pole Alignment screen appears.
Figure 23: Cross Pole Alignment Starting
13.
Wait until the CW is assigned and then rotate the feed arm until the Delta value
is greater than the Threshold value. Proceed to step 18.
SE VSAT Install and Monitor
May, 2007
18
Proprietary and Confidential
Summary of Contents for SkyEdge II
Page 2: ......