background image

www.maschinendiagnose.de

Manual Version 3.0

Summary of Contents for PeakStore5

Page 1: ...www maschinendiagnose de PeakStore5 Manual Version 3 0...

Page 2: ......

Page 3: ...25 12555 Berlin Phone 49 30 65 76 25 65 Fax 49 30 65 76 25 64 Dipl Ing Axel Haubold Sales office West Am Kaempen 22 44227 Dortmund Phone 49 231 77 64 723 Fax 49 231 77 64 724 Dipl Ing Kai Uchtmann Ban...

Page 4: ...1 Sensor Inputs 9 4 2 Speed Inputs 10 4 3 External sensor supply voltage and protected earth connection 10 4 4 USB Connection 11 4 5 USB connection expansion port 11 4 6 Connections at the Tablet 12...

Page 5: ...PeakStore5 Manual Version 3 0 3 6 3 2 Origin Measurement 27 6 3 3 Test Measurement 27 6 3 4 Validation Measurement 27 6 3 5 Finalization 28 6 4 Data Management 29 7 Remote Control 32...

Page 6: ...an interface to control the measurement and input additional side information in a measurement protocol Additionally online spectra can be calculated during the measurement 1 1 CE Labeling We declare...

Page 7: ...ed to the PeakStore5 must be shielded Please consider that all signal inputs and outputs except the power connection is shielded Only in this case a high interference immunity and a reduced interferen...

Page 8: ...the device 1 8 Transportation Transport the PeakStore5 in the original package or in a package that ensures an adequate protection Transport damages are excluded from guarantee claims 1 9 Before Inst...

Page 9: ...n Before exchanging the accumulator it is required to turn of the tablet The accumulator can be accessed on the back of the tablet Beforehand the measurement system must be unplugged This can be done...

Page 10: ...24 V Cable for protected earth connection Replacement accumulator 3 Control Elements Picture 2 Function keys front bottom Source Winmate M101 Manual The measurement can be started via the function key...

Page 11: ...al power supply has to be connected to the DC IN connector on the right side see 4 3 While connecting the sensors the correct assignment of the numbered sensors to the inputs has to be considered The...

Page 12: ...of the PeakStore5 or via the remote control The display can variate slightly If there are heavy variations the orientation of the speed sensor should be checked and the measurement should be repeated...

Page 13: ...from GfM It has to be ensured that not both the expansion port and the separate USB connection are used in parallel Picture 8 Pin assignment USB connection 4 5 USB connection expansion port The connec...

Page 14: ...measurements 5 Standby Mode To achieve a long battery runtime it is wise to switch of the measurement module if it is not needed There are two different modes available to reduce the power consumptio...

Page 15: ...life time of the tablet is increased considerably by this deactivation However the reactivation time for the measurement module is much longer than the other variant To deac tivate the expansion port...

Page 16: ...ted measurement devices that are connected via USB The PeakStore5 is than listed in the device browser of the Peakanalyzer Manager like any other system After the selection of the PeakStore5 in the de...

Page 17: ...lculation of online order and frequency spectra is desired during the measurement If the online calculation is not activated the battery life time is increased Show IP Address for App If this option i...

Page 18: ...the impulses per rotation that are measured by the sensor must be adjusted to the correct value The trigger threshold of the speed channel can be adopted if necessary The speed sensors that are deliv...

Page 19: ...or For accelerometers with IEPE interface this value is usually 0 For analogues displacement sensors the offset of the displacement sensor must be entered Unit the physical unit of the sensor Measurem...

Page 20: ...onfigured for this sensor The following r m s values of vibration velocity or vibration acceleration can be configured for each sensor DIN ISO 10816 3 with bandwidth 10 Hz 1 kHz DIN ISO 10816 21 with...

Page 21: ...owing templates are availa ble 2 Spur gear stage Planetary stage 3 Spur gear stage 4 Spur gear stage Planetary stage A60 B130 Blade bearing Motor Planetary stage 2 Spur gear stage Motor Motor Gear box...

Page 22: ...s also increases the power consumption of the PeakStore5 If the monitoring mode is not needed it is recommended to deactivate the PeakStore5 to increase the battery life time A measurement can be star...

Page 23: ...ors and other sensors The current measurement value is shown Speed The current speed value Additionally the variation of the speed in percent during the measurement By pressing on the sensor the time...

Page 24: ...If an already placed sensor is clicked again a popup will open to change the measurement position and direction If the same sensor arrangement is used in multiple measurements it is recommended to sav...

Page 25: ...sors also in parallel can be viewed The signals that should be shown can be changed by the sensor listing on the right side The curve window is frequently updated to show the latest data during the me...

Page 26: ...visualization of the characteristic values can be found on the characteristic value site The characteristic value is recalculated continuously during the measurement for each sensor The graphical vie...

Page 27: ...fterwards up to 5 validation measurements will follow where balancing masses are applied to the layers to reduce the initial imbalance Generally each measurement consists of a preparation phase the ac...

Page 28: ...e vibration sensor must be placed on each layer It is necessary to take into account the correct layer for each vibration sensor as parametrized in the configuration see also 6 1 3 Picture 23 Paramete...

Page 29: ...re set up It will be first waited until the speed is in the valid range If this is the case the actual measure ment starts automatically and also stops automatically if the required number of revoluti...

Page 30: ...ss The additionally cal culated masses must be added to the existing masses from the last validation measurement This step can be repeated up to 5 times 6 3 5 Finalization If the target quality level...

Page 31: ...uration View The measurement data is grouped according to the used configura tion Order View The measurement data is grouped according to the order number that was entered in the measurement protocol...

Page 32: ...here the desired target directory can be chosen Thus a con nected USB Stick can be chosen to export the data The selected measurement data will be compressed to a single file for all measurements or a...

Page 33: ...ng and calculation Picture 30 Diagnostic Tool On the left side of the Diagnostic Tool the measurement data that were selected in the PeakStore5 data management are shown Each measurement can be prepro...

Page 34: ...onnection must be established between Smartphone and PeakStore5 to get the PeakStore Remote App work ing It is recommended to use an additional WLAN route as access point between these two where both...

Page 35: ...and maximal values are only updated during a measurement If the measurement is currently stopped only the current value is updated Via the button Start on the right bottom a measurement can be started...

Page 36: ......

Page 37: ...Q0188e GfM Gesellschaft f r Maschinendiagnose mbH Koepenicker Strasse 325 12555 Berlin Deutschland Germany Phone Berlin 49 30 65 76 25 65 Phone Dortmund 49 231 77 64 723 www maschinendiagnose de...

Reviews: