7 Fusion Preparation
Operating instructions SG 160
16
7.4
Socket fusion preparations
Usually on the SG 160, the fitting is clamped on the right and the pipe on the
left, as seen from the user’s side. If necessary, the machine can be prepared
or rebuilt at a later time for the opposite clamping version. The following
instructions refer to the fitting being clamped on the right side.
Mount the disengaging device on the fitting side (in our example on the right).
Mount the depth stop in such a way that the locking fork points toward the
fitting side.
The stops on the depth stop must be set according to the following
standards:
Summary of Contents for SG 160
Page 56: ...11 Customer service Operating instructions SG 160 52...
Page 57: ...Operating instructions SG 160 11 Customer service 53...
Page 58: ......
Page 59: ......