Foot Half Rail
with Quick-Release
Hardware (Option 1)
Foot Half Rail
with Fixed Attachment
Hardware (Option 2)
OPTIONAL HALF RAIL INSTALLATION—FOOT END
(KIT ZA82900; INCLUDES TWO HALF RAILS, TWO CROSSTUBES,
TWO MOUNTING BRACKETS, AND HARDWARE)
NOTE: Kit ZA82900, for both 80" and 76" length beds, includes attachment hardware for both
Option 1 and Option 2 below.
IMPORTANT: Lubricate all pivot joints as needed with Aerosol White Lithium Grease.
Installation
1. Left and right Half Rails mount to the
bed in a similar fashion; left or right
designation is based on the
patient’s orientation while
occupying the bed.
2. To mount the half rails
to the bed foot end,
you must first attach
two rail brackets (#4)
and crosstubes (#5)
to the foot deck; see
installation instructions on
page 19.
3. Align the rail pivot arm holes
with the mounting bracket
holes as shown.
4. a. For Quick Release (Option 1),
insert the Clevis Pin ends of the
Lanyard assembly (#3a) from the
outside through the pivot arm and mounting
bracket holes. From the inside, secure with the
Hair Pin Clips on the other side of the Lanyard
Assembly (#3b).
b. For Fixed Position (Option 2), insert the
5
/
8
-11 x
4.50" Cap Screws (#6) from the outside through
the rail and bracket holes. From the inside,
secure the screws with
5
/
8
-11 Nylock Nuts (#7).
!
WARNING: When assessing the Risk of Entrapment, consider
the bed, mattress, headboard, footboard, assist devices (i.e. rails
and assist bars) and other accessories as an entire system. All
bed systems are evaluated for full compliance to the FDA/CDRH
“Hospital Bed System Dimensional and Assessment Guidance to
Reduce Entrapment” guidelines.
!
WARNING: It is extremely important to review the resident/patient’s physical and mental condition and initiate an
appropriate individual care plan to address any entrapment risks. See page 5 for further information.
GF Health Products, Inc. - www.grahamfield.com
Liberty Series Service Manual 999-0822-190G
LIBERTY SERIES
20
For Parts Call Medical Parts Source: 941-342-7725