www.geyserwise.co.za
26
PV System Installers Guide
______________
Installation of the element
Replace lid on control box and fasten properly.
Before you replace the lid it is important to do a final check on the electrics by comparing it to the
wiring as indicated on the lid. Insert the DC thermal cut-out in the geyser temperature pocket.
MPPT CONNECTION
Connect MPPT signal wire as indicated
Connect element connector cable
to the MPPT
1
2
Summary of Contents for 100L geyser
Page 39: ...www geyserwise co za 37 PV System Installers Guide ___________________________________ NOTES...
Page 40: ...www geyserwise co za 38 PV System Installers Guide ___________________________________ NOTES...
Page 41: ...www geyserwise co za 39 PV System Installers Guide ___________________________________ NOTES...