www.geyserwise.co.za
20
6
Remove element mounting bolts using socket wrench. Note position of thermostat bracket to be
reinstalled later.
The positioning of the thermostat pocket in relation to the geyser is very important.
The thermostat pocket should never be directly below the element or directly above the element
when installed into the geyser. A thermostat position of 10 o’clock (see page 23) on a clock is the
best position for the thermostat to ensure a correct water temperature reading.
7
Clean gasket area in tank
8
Install gasket into recess in tank.
9
Install element and thermostat pocket. Tighten bolts in diagonal pattern.
10
Close drain valve and turn ON cold water supply.
11
Allow all trapped air to escape from open hot water faucet until water has a constant flow. Close hot water
faucet.
12
Inspect wiring. If corrosion is present on wiring, cut and strip wire 1/2” (Only if wire is long enough). If
corrosion is still present, or wire is not long enough consult electrician for wire replacement and wire
gauge selection. Loose, corroded or faulty wiring connections can cause heat buildup or fire at wiring
terminals.
13
Connect electric wires to element. Tighten screws
14
Replace plastic terminal protector
15
Replace insulation and access cover
16
Tank must be properly filled with water and free of air before applying electric power to prevent element
damage.
Simply Plug in the Anderson plug fitted on the White and Blue cables into the element connector
cable.
White DC
Blue DC
Black AC
Red AC
PTC Element
PV System Installers Guide
______________
Installation of the element
Summary of Contents for 100L geyser
Page 39: ...www geyserwise co za 37 PV System Installers Guide ___________________________________ NOTES...
Page 40: ...www geyserwise co za 38 PV System Installers Guide ___________________________________ NOTES...
Page 41: ...www geyserwise co za 39 PV System Installers Guide ___________________________________ NOTES...