S53-053 Panther
50 of 53
18.3.8
Fig. 50 Y - Support tube placement procedure
THIS DRAWING IS PROPERTY OF GEOMIL EQUIPMENT BV ( GME ). ANY DISCLOSURE, TRANSFER, USE AND/OR REPRODUCTION OF THIS DRAWING,
OR THE DESIGN HEREIN, WITHOUT EXPRESS WRITTEN CONSENT FROM GME IS PROHIBITED. ALL RIGHTS RESERVED.
FIG. 50 Y
1 MOVE PUSH FRAME UP AND PLACE THE SUPPORT TUBE
2 PLACE THE SUPPORT TUBE INSERT TOOL
3 LOWER PUSH FRAME TO ITS LOWEST POSTION TO LOCK THE SUPPORT TUBE
4 MOVE PUSH FRAME UP AND REMOVE TOOL
DETAIL A
ATTENTION!
Make sure the centralizer plates are inserted.
Furthermore do not let the insert tool rest on one
of the two slide bars underneath the clamp!