![Geometrics Geode EM3D Operation Manual Download Page 28](http://html1.mh-extra.com/html/geometrics/geode-em3d/geode-em3d_operation-manual_2214700028.webp)
28
xiii.
CSAMT Acquisition: This starts CSAMT acquisition based on the
schedule set up in the “Setup/Frequency Stepping” menu. Once
CSAMT acquisition is started the following screen is displayed.
The number of channels displayed was set up in the “View/Display Parameters” menu. If there
are more channels acquired than displayed the left-right arrow keys will display additional
channels. In the image above, the writing just below the traces shows the data was acquired at
a sample rate of 62.50 Hz. The record length is 375 samples. The acquired frequency is 2.667
Hz.
The bottom field boxes show that CSAMT is being recorded, there is one receiver box; COM5 is
used for the GPS with 9 satellites detected; a 60 Hz harmonics comb filter is active; the display is
of an acquisition of 2.667 Hz; and it is the first time through the acquisition cycle.
Note that you can change the time scale displayed on the screen by using the “-“ and “+” keys to
expand or contract the portion of the time series displayed. Note that you can scroll through a
sequence of time series by using the “enter” and “backspace” keys to go forward or backward in
the sequence. You may need to read in the GTS file to scroll through the time series.