Page
D - 20
Document 57.0008.7200 - 05/2007
Handler with telescopic boom
GTH-3512
MAINTENANCE
■
Checking the block valves
(every 3 months)
The piloted blocking valves allow to held the load in
position in case of burst of a flexible hose.
To check the efficiency of a valve, proceed as follows:
•
Load a weight near the maximum payload (3500 kg
roughly) onto the boom.
•
Raise the load some centimetres above the ground
(max 10 cm). To check the valve on the telescope
extension cylinder move the boom to maximum
height and extend it some centimetres.
•
Loosen the oil hoses to the cylinder of which you
are checking the valve with caution.
Summary of Contents for GTH-3512
Page 2: ...Courtesy of Crane Market...