© 2020 Genesis Attachments, LLC
Genesis GHG Handling Grapple
18
Performing scheduled maintenance will promote safe, reliable operation of your attachment. Use
maintenance procedures described in this manual. If you are not able to safely and competently
perform these procedures, have a Genesis dealer perform them.
Four-Hour Checklist
Inspect:
• Bolts - check for loose bolts, replace if damaged
• Fittings and hoses for damage or leaks
• Bracket pivot for wear and pin retainers
• Cylinder pivot for wear and pin retainers
• Entire attachment for cracks (visual check)
Grease:
•
Cylinder pins (the fittings on the end of the cylinder)
• Pivot pins/drag link pins
Eight-Hour Checklist
Perform four-hour checklist plus the following:
Grease:
• Bracket pivot (stick pin)
• Bracket cylinder(H-link pin)
• Rotation bearing (four locations)
• Rotation bearing gear teeth
Tines:
• Check for loose or damaged bolts, retorquing loose bolts
• Build-up and hard-surface as required
Long-term Maintenance
• Check all bolts, including slewing ring bolts, after the initial 80 hours of operation
• Replace slewing ring bolts every 2000 hours
• Reseal cylinder every 4000 hours
• Reseal swivel every 4000 hours
MAINTENANCE SCHEDULE
Extreme operating conditions may require shortened
maintenance intervals.
NOTICE