Generac Power Systems GenTran 6295 Installation And Operating Instructions Manual Download Page 3

 

TABLE 2 – CIRCUIT WORKSHEET 

CIRCUIT # 

6295 or 6378 

6296 or 6380 

APPLIANCE OR CIRCUIT 

A1 

NA 50A 

 

B1 

NA 50A 

 

A2 30A 

30A 

 

B2 30A 

30A 

 

A3 

NA 20A 

 

B3 

NA 20A 

 

A4 15A 

20A 

 

B4 20A 

15A 

 

A5 15A 

20A 

 

B5 20A 

20A 

 

A6 20A 

15A 

 

B6 15A 

15A 

 

A7 20A 

NA 

 

B7 20A 

NA 

 

 

STEP 2:  INSTALLATION PROCEDURE: 

  HAZARDOUS VOLTAGES ARE PRESENT INSIDE TRANSFER SWITCH ENCLOSURES THAT CAN CAUSE DEATH OR SEVERE PERSONAL INJURY.  FOLLOW PROPER INSTALLATION, 

OPERATION AND MAINTENANCE PROCEDURES TO AVOID HAZARDOUS VOLTAGES.  

TURN OFF THE MAIN CIRCUIT BREAKER IN THE LOAD CENTER BEFORE STARTING INSTALLATION

.

  

 

I. TRANSFER SWITCH INSTALLATION: 

A:  Surface Mount Installation Using Power Inlet Box (included in models 6295-6296) 

1.

 

Select a location on the left or right side of the Load Center to mount transfer switch, as it is provided with 21.5” of flexible conduit.  Remove the cover to the 
load center and the cover of the transfer switch, save the screws.  Measure and cut conduit to a length and snap provided fittings on ends.  Locate and remove 
a knockout (KO) on lower side of load center that matches the conduit fitting size on the wiring harness.  After attaching the flexible conduit to both enclosures 
through one of the bottom or side KOs, hold the transfer switch in position against the wall on which it is to be mounted, mark the holes on the wall for the 
anchoring screws and anchor to wall (anchors not provided). Be sure NOT to stress the flexible conduit, as it may break.  [

NOTE:  The Electrical Non-Metallic 

Tubing (ENT) provided is UL Listed and recognized by the National Electrical Code (NEC) for this application. However, some local codes and inspectors may 
prohibit its use in buildings that exceed (3) floors above grade.]  

 

2.

 

Fish the pre-assembled wire harness through the conduit. Strip each wire in the wire harness 5/8” and insert and tighten the wires to the correspondingly 
marked circuit breakers in the transfer switch.  As you attach each marked wire to the circuit breaker, write the appliance name on the label on the transfer 
switch cover per the TABLE 2 CIRCUIT WORKSHEET completed in Step 1.  The unmarked BLACK wires in the harness are inserted into the UTIL MAIN 2-pole 
breaker in the transfer switch.  Attach the WHITE wire to the neutral bar located on the right side and attach the GREEN wire to the ground bar located on the left 

side of the transfer switch. 

3.

 

Install appropriately sized conduit, fittings and wire between the Power Inlet Box (Models 6295-6296 only) mounted on the building exterior and the transfer 
switch, referring to Power Inlet Box Install Instructions below.  Locate and remove a KO on the right top or side of the transfer switch, pull wire into transfer 
switch enclosure and secure wire with fitting.  . Install the green ground wire into the ground bar on the left, and install the white neutral wire into neutral bar on 

the right.  Using provided wiring connectors, connect black wire from PIB to black wiring going to Meter “A”.  Repeat for red wire from PIB to Meter “B”. 

Note: 

Models 6296 and 6380

 use current transformers (CTs) connected to the meters; pass the black wire from the PIB through the hole in the CT connected to the 

“A” meter before connecting to the “GEN MAIN A” circuit breaker.  Repeat for the red wire from the PIB, passing through the hole in the CT connected to the 

“B” meter before connecting to the “GEN MAIN B” circuit breaker. See FIGURE 2 WIRING DIAGRAM.  Reinstall the cover to the transfer switch.

 

4.

 

In the main Load Center, remove the wires from the breakers for the loads that will be relocated to the transfer switch.  Cut each harness wire to a convenient 
length, strip off 5/8” insulation and connect to the wires removed from the breakers per TABLE 2 with the provided wire connectors.  Remove two adjacent 
single pole breakers from which the load wires were removed and install the NEW 60A or 100A 2-pole circuit breaker (as required in the Other Items Needed 
section) in their place. Insert the unmarked BLACK wires from the harness into the new circuit breaker. Terminate the WHITE and GREEN wire in the harness in 
an open position in the Neutral and Ground bars respectively.  If there is no separate ground bar, insert the GREEN wire into an open position in the NEUTRAL 

bar, and tighten. 

5.

 

Reinstall the cover to the load center, and turn ON the MAIN breaker in the load center. Turn ON all branch circuit breakers in both panels.  Turn ON the UTIL 
MAIN in the transfer switch.  Check that power is restored to all appliances.  Transfer switch installation is complete. 

 

B. Flush Mounting in New Construction (unfinished walls) Using Power Inlet Box (included in 6295-6296): 

1.

 

Install the transfer switch at the same time as the main load center, in adjacent wall stud openings (the transfer switch enclosure is 14.25” wide and will fit in 

standard 16” wall framing).  Remove the transfer switch dead front cover, save the screws. Knock out the appropriate mounting slots on the sides of the 
enclosure and secure to framing with nails or screws; be sure the front edge of the enclosure extends forward to be flush with the thickness of the finished 
wallboard.   

2.

 

Mark and drill a 2 1/8” diameter hole in the stud between the main load center and the transfer switch, lining up with the lowest side KO in the load center and 
near the bottom center KO in the transfer switch.  Remove the KO’s, cut the provided conduit to length, snap on the provided fittings to the conduit, push the 

conduit through the drilled hole and install the conduit assembly to the KO openings in the main load center and transfer switch. 

3.

 

Complete Section IA3 above. Cut a piece of cardboard to 14.5” x 12.5”, using the 4 screws removed in step IIA1, attach the cardboard to the front of the 
transfer switch. 

Summary of Contents for GenTran 6295

Page 1: ...rmination positions for all branch circuits Subfeed lugs provided to feed additional downstream panels or to expand beyond 16 circuits Dual wattmeters help you monitor and balance the loads on your ge...

Page 2: ...be used in the transfer switch GFCI and AFCI breakers require an isolated neutral connected from the load to the GFCI or AFCI The load neutral needs to be connected with a wire nut to a 3 6 foot piece...

Page 3: ...ound bar on the left and install the white neutral wire into neutral bar on the right Using provided wiring connectors connect black wire from PIB to black wiring going to Meter A Repeat for red wire...

Page 4: ...Mount the power inlet box on the outside of the building in a convenient location minimum 24 above grade using the four holes provided in the back of the enclosure Use sealant around the anchoring scr...

Page 5: ...2 pole 100 amp Utility Main and a 2 pole 60 amp Generator Main Protected by US Patent No US 6 861 596 B2 Generac Power Systems Inc Toll Free 1 888 GENERAC www generac com 0197000SBY 2012 Generac Powe...

Page 6: ...du circuit de service ou de la g n ratrice qui peut tre dangereuse et viter ainsi tout d g t mat riel et de graves blessures des lectriciens Le bo tier peut tre encastr ou mont en surface l int rieur...

Page 7: ...loc neutre commut SNK avec le commutateur de transfert TABLEAU 1 CARACT RISTIQUES Mod le 6295 et 6378 6296 et 6380 Nombre de circuits disponibles sur le commutateur de transfert 10 12 Nombre maximum d...

Page 8: ...ter de faire passer le cordon de la g n ratrice travers une porte ou une fen tre 5 D cidez l endroit o vous installerez la bo te d entr e d alimentation sur un mur ext rieur au moins 5 pieds de toute...

Page 9: ...u commutateur de transfert et gardez les vis D fon ez les fentes de montage sur les c t s du bo tier et fixez le la charpente avec des clous ou des vis v rifiez que le bord avant du bo tier vient suff...

Page 10: ...limentation dans la bo te d entr e d alimentation ARR TEZ tous les disjoncteurs du commutateur de transfert 3 D marrez la g n ratrice l ext rieur en suivant les proc dures d crites dans le manuel du p...

Page 11: ...6296 et 6380 a un disjoncteur bipolaire de 100 amp res pour l installation de service principaleet un disjoncteur bipolaire de 60 amp res pour la g n ratrice Prot g par le brevet am ricain no US 6 86...

Page 12: ...s electricistas La caja puede instalarse a ras o sobre una superficie en interiores Mazo de cables prearmado con todos los cables marcados claramente para una f cil conexi n al centro de carga El inte...

Page 13: ...ida la garant a del generador se debe instalar un accesorio de kit neutral con interruptor SNK con su interruptor de transferencia TABLA 1 ESPECIFICACIONES Modelo 6295 y 6378 6296 y 6380 Cantidad de c...

Page 14: ...caja de entrada de cables el ctricos Usar el cable del generador para conectar su generador a la caja de entrada de cables el ctricos en el exterior Ya sea que su centro de carga se encuentre en un s...

Page 15: ...el centro de carga ENCIENDA todos los disyuntores de circuitos derivados en ambos paneles ENCIENDA el conducto PRINCIPAL DEL SERVICIO EL CTRICO en el interruptor de transferencia Verifique que la ele...

Page 16: ...uctos de ventilaci n o cualquier otra abertura El Mon xido de carbono CO de un generador es mortal y puede matarlo en minutos Lea y siga todas las instrucciones del generador antes de usarlo A Pasar d...

Page 17: ...y 6380 incluyen un conducto principal de servicio el ctrico de 2 polos y 100 amp y un conducto principal del generador de 2 polos y 60 amp Protegido por la Patente de los Estados Unidos N US 6 861 596...

Reviews: