V
04/13
20
•
Initial start-up
OptiFeed B FPS19
Operation
WARNING
If the Fresh powder system is not being used in conjunction with a
sufficiently powerful suction unit, then the stirred-up dust from the
coating powder can cause respiratory issues or cause a
slippage/falling hazard.
- The manual equipment may only be operated in conjunction with a
sufficiently powerful suction unit (such as Gema Classic Open
booth).
1. Switch on the Fresh powder system
The switch lamp illuminates and the unit is ready for operation
2. Swivel aside the fluidizing/suction unit
3. Place the open powder container on the vibrating table
WARNING
If a container is placed on the vibrating plate, then fingers caught in
the gap between the two plates can be crushed.
- The container may weight a max. of 30 kg.
4. Place the fluidizing/suction unit onto the powder
5. Switch on the vibrator manually (position I)
6. Adjust the fluidization with the pressure regulator on the Fresh
powder system
Check the powder fluidization in the powder container.
The powder fluidization in the powder containers depends on
the powder characteristic, the humidity and the ambient air
temperature. Fluidizing starts by switching on the Fresh
powder system.
WARNING
If the ventilation has been incorrectly adjusted, then the coating
powder can create a dust cloud capable of causing respiratory
problems.
- Adjust the fluidization correctly
7. The fluidizing/suction unit digs itself into the powder
8. Switch on the OptiFeed PP06 Powder pump
9. The powder pump conveys powder to the powder hose
Note:
For further information, see the OptiFeed PP06 Powder pump
operating manual!