GEMÜ 649 eSyDrive
14 Installation in piping
NOTICE
Gasket and clamp
▶
The gasket and clamps for clamp connections are not in-
cluded in the scope of delivery.
1. Keep ready gasket and clamp.
2. Carry out preparation for installation (see chapter "Prepar-
ing for installation").
3. Insert the corresponding gasket between the body of the
product and the pipe connection.
4. Connect the gasket between the body of the product and
the pipe connection using clamps.
5. Re-attach or reactivate all safety and protective devices.
14.4 Installation with butt weld spigots
Fig. 8: Butt weld spigots
1. Carry out preparations for installation (see chapter "Pre-
paring for installation").
2. Adhere to good welding practices!
3. Remove actuator
A
(see chapter "Removing the actuator").
4. Weld the body of the product in the piping.
5. Allow butt weld spigots to cool down.
6. Mount actuator
A
(see chapter "Mounting the actuator").
7. Re-attach or reactivate all safety and protective devices.
8. Flush the system.
14.5 Installation with threaded sockets
Fig. 9: Threaded socket
NOTICE
Sealing material
▶
The sealing material is not included in the scope of deliv-
ery.
●
Only use appropriate sealing material.
1. Keep thread sealant ready.
2. Carry out preparations for installation (see chapter "Pre-
paring for installation").
3. Screw the threaded connections into the pipe in accord-
ance with valid standards.
4. Screw the body of the product onto the piping using ap-
propriate thread sealant.
5. Re-attach or reactivate all safety and protective devices.
14.6 Installation with threaded spigots
Fig. 10: Threaded spigots
NOTICE
Thread sealant
▶
The thread sealant is not included in the scope of deliv-
ery.
●
Only use appropriate thread sealant.
1. Keep thread sealant ready.
2. Carry out preparations for installation (see chapter "Pre-
paring for installation").
3. Screw the pipe into the threaded connection of the valve
body in accordance with valid standards.
ð
Use appropriate thread sealant.
4. Re-attach or reactivate all safety and protective devices.
14.7 Installation with flanged connection
Fig. 11: Flanged connection
NOTICE
Sealing material
▶
The sealing material is not included in the scope of deliv-
ery.
●
Only use appropriate sealing material.
Summary of Contents for 649 eSyDrive
Page 24: ...9 2 5 www gemu group com 24 48 GEM 649 eSyDrive 9 Dimensions...
Page 26: ...9 2 7 www gemu group com 26 48 GEM 649 eSyDrive 9 Dimensions...
Page 30: ...10 www gemu group com 30 48 GEM 649 eSyDrive 10...
Page 37: ...www gemu group com 37 48 GEM 649 eSyDrive 15 6 15 Electrical connection...