ONE 7TS – Maintenance
DATA SHEET I [a]:
BODY AND CRANK GEAR
Checking of components
ATTENTION:
This procedure must be performed after setting machine to maintenance mode (see paragraph 7.3.3)
RESOURCES AND EQUIPMENT
: MAINTENANCE TECHNICIAN
FREQUENCY
: IN CASE OF FAILURE
TIME REQUIRED
: depends on actual condition of
copnents to replace gaskets: 50-75
MINUTES
DESCRIPTION:
In case of faults we suggest you contact the Technical Support Service of
GEA Niro Soavi S.p.A.
GENERAL
The reciprocal linear motion of the plungers is obtained with a system of sturdy, oversized crank gears
(crankshaft, connecting rod, headcross).
The generic figure below shows the system
page 7.83
This manual is property of
GEA Niro Soavi S.p.A.
and no part of it may be reproduced.
Summary of Contents for ONE 11TS
Page 2: ...GEA Niro Soavi S p A COVER02 DOC REV DESCRIPTION DATE SIGN 0 1 EDITION 05 07 2011 ANC ...
Page 235: ......
Page 245: ......
Page 247: ......
Page 255: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ......
Page 277: ......
Page 278: ......
Page 279: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......