ONE 7TS – Setting up and first start up
c) Ensure that the high pressure flanges, connectors and all the nuts in the compression head
(3)
have
been tightened properly to the values indicated in the Table "Tightening torque values " in chapter 7 of
this manual (data sheet 00[C]).
FIG. 5- 5
d) Check tightness of plungers
(4)
and the presence of seal packings, if they have been removed for
storage or machine inactivity of over 3 months.
FIG. 5- 6
page 5.5
This manual is property of
GEA Niro Soavi S.p.A.
and no part of it may be reproduced.
Summary of Contents for ONE 11TS
Page 2: ...GEA Niro Soavi S p A COVER02 DOC REV DESCRIPTION DATE SIGN 0 1 EDITION 05 07 2011 ANC ...
Page 235: ......
Page 245: ......
Page 247: ......
Page 255: ......
Page 263: ......
Page 264: ......
Page 265: ......
Page 266: ......
Page 267: ......
Page 268: ......
Page 269: ......
Page 270: ......
Page 271: ......
Page 272: ......
Page 273: ......
Page 274: ......
Page 275: ......
Page 276: ......
Page 277: ......
Page 278: ......
Page 279: ......
Page 280: ......
Page 281: ......
Page 282: ......
Page 283: ......
Page 284: ......
Page 285: ......