Initial Commissioning
Handing over to the owner
2007-9015-001
03-2014
6.4
First start
Once the equipment is fully assembled in accordance with instructions and the
operating and safety instructions are read carefully, the equipment can be put
into operation.
Activate the equipment and check the functions.
Refer to section on Operation
6.5
Checks after initial commissioning
● Add biodegradable oil to the top of the piston if needed. Refer to section on
Lubricant specifications.
● Check the oil level in the hydraulic power unit.
● Inspect all hydraulic fittings for leaks.
If the oil level has dropped, check for leaks. Defective parts may need to be
repaired.
Note!
At the first operation, the oil level may have dropped. This will be
caused by the first load of hydraulic circuit. Add hydraulic oil
accordingly. Refer to section on Lubricant specifications.
6.6
Handing over to the owner
Hand-over warranty registration form
The warranty registration form must be completed and signed by the customer
and the dealer. The warranty registration form must be returned back to GEA
Houle Inc. to validate the warranty.