![GE Transport PT878 User Manual Download Page 21](http://html.mh-extra.com/html/ge/transport-pt878/transport-pt878_user-manual_128485021.webp)
Chapter 2. Initial Setup
Transport® Model PT878 Portable Liquid Flowmeter User’s Manual
5
Chapter 2. Initial Setup
Before making measurements, you must prepare the PT878 for operation.
This includes the following procedures:
•
Making Electrical Connections
•
Charging and/or Replacing Batteries
•
Powering On and Off
•
Using the Screen and Keypad
•
Obtaining On-Line Help
Figure 1 below shows the PT878 in its standard soft case (a) and in the
optional solid case (b). In the solid case, the interior is structured for optimal
protection of the PT878 and its accessories.
Figure 1: The PT878 and Accessories
(a)
(b)