![GE PQM II Instruction Manual Download Page 51](http://html.mh-extra.com/html/ge/pqm-ii/pqm-ii_instruction-manual_128427051.webp)
CHAPTER 3: OPERATION
PQMII POWER QUALITY METER – INSTRUCTION MANUAL
3–3
•
TX2
: The PQMII is transmitting information via the COM2 RS485 communications
port when lit.
•
RX2
: The PQMII is receiving information via the COM2 RS485 communications port
when lit.
3.2.4
Relays
The status of the output relays is displayed with these LED indicators.
•
Alarm
: The Alarm relay is intended for general purpose alarm outputs. This
indicator will be on while the Alarm relay is operating. When the condition clears,
the Alarm LED indicator turns off. If the alarm relay has been programmed as
“Latched”, the alarm condition can only be cleared by pressing the
RESET
key or by
issuing a computer reset command.
•
Aux1
: The Aux 1 relay is intended for control and customer specific requirements.
The Aux1 LED indicator is on while the Auxiliary 1 relay is operating.
•
Aux2
: The Aux 2 relay is intended for control and customer specific requirements.
The Aux2 LED indicator is on while the Auxiliary 2 relay is operating.
•
Aux3
: The Aux 3 relay is intended for control and customer specific requirements.
The Aux3 LED indicator is on while the Auxiliary 3 relay is operating.
Summary of Contents for PQM II
Page 8: ...TOC VI PQMII POWER QUALITY METER INSTRUCTION MANUAL TABLE OF CONTENTS ...
Page 58: ...3 10 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 3 OPERATION ...
Page 84: ...4 26 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 4 SOFTWARE ...
Page 170: ...6 32 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 6 MONITORING ...
Page 196: ...7 26 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 7 APPLICATIONS ...
Page 198: ...8 2 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 8 WARRANTY ...
Page 208: ...A 10 PQMII POWER QUALITY METER INSTRUCTION MANUAL APPENDIX A ...
Page 216: ...B VIII PQM POWER QUALITY METER INSTRUCTION MANUAL CHAPTER B INDEX ...