![GE PQM II Instruction Manual Download Page 152](http://html.mh-extra.com/html/ge/pqm-ii/pqm-ii_instruction-manual_128427152.webp)
6–14
PQMII POWER QUALITY METER – INSTRUCTION MANUAL
CHAPTER 6: MONITORING
control power is applied. The PQMII updates this value every hour based on the
previous 24-hour period. This information will be lost if control power to the PQMII is
removed.
•
REAL ENERGY COST
: This message displays the total cost for the real energy
accumulated since the
TIME OF LAST RESET
date.
•
REAL ENERGY COST PER DAY
: Displays the average cost of real energy per day from
time of last reset to the present. The cost per kWh is entered in the
S1 PQMII SETUP
ÖØ
CALCULATION PARAMETERS
ÖØ
ENERGY COST PER KWH
setpoint.
•
TARIFF PERIOD 1(3) COST
: These messages display the cost accrued for the three
user-definable tariff periods. The start time and cost per kWh for these tariff periods
are entered with the
S1 PQMII SETUP
ÖØ
CALCULATION PARAMETERS
ÖØ
TARIFF PERIOD 1(3) START
TIME
and the
S1 PQMII SETUP
ÖØ
CALCULATION PARAMETERS
ÖØ
TARIFF PERIOD 1(3) COST PER KWH
setpoints, respectively.
•
TARIFF PERIOD 1(3) NET ENERGY
: These messages display the net energy for the three
user-definable tariff periods. The start time and cost per kWh for these tariff periods
are entered with the
S1 PQMII SETUP
ÖØ
CALCULATION PARAMETERS
ÖØ
TARIFF PERIOD 1(3) START
TIME
and the
S1 PQMII SETUP
ÖØ
CALCULATION PARAMETERS
ÖØ
TARIFF PERIOD 1(3) COST PER KWH
setpoints, respectively.
•
TIME OF LAST RESET
: This message displays the time and date when the energy
parameters were last cleared through the
S1 PQMII SETUP
ÖØ
CLEAR DATA
ÖØ
CLEAR ENERGY
VALUES
setpoint.
6.2.6
Demand Metering
PATH: ACTUAL VALUES
Ö
A1 METERING
ÖØ
DEMAND
DEMAND
[
Z
]
PHASE A CURRENT
DEMAND = 125 A
MESSAGE
PHASE B CURRENT
DEMAND = 125 A
MESSAGE
PHASE C CURRENT
DEMAND = 125 A
MESSAGE
NEUTRAL CURRENT
DEMAND = 125 A
MESSAGE
3
Φ
REAL POWER
DEMAND = 1000 kW
MESSAGE
3
Φ
REACTIVE POWER
DEMAND =
25 kvar
MESSAGE
3
Φ
APPARENT POWER
DEMAND = 1007 kVA
MESSAGE
Ia MAX DMD = 560 A
12:00:00am
01/01/95
MESSAGE
Ib MAX DMD = 560 A
12:00:00am
01/01/95
Summary of Contents for PQM II
Page 8: ...TOC VI PQMII POWER QUALITY METER INSTRUCTION MANUAL TABLE OF CONTENTS ...
Page 58: ...3 10 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 3 OPERATION ...
Page 84: ...4 26 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 4 SOFTWARE ...
Page 170: ...6 32 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 6 MONITORING ...
Page 196: ...7 26 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 7 APPLICATIONS ...
Page 198: ...8 2 PQMII POWER QUALITY METER INSTRUCTION MANUAL CHAPTER 8 WARRANTY ...
Page 208: ...A 10 PQMII POWER QUALITY METER INSTRUCTION MANUAL APPENDIX A ...
Page 216: ...B VIII PQM POWER QUALITY METER INSTRUCTION MANUAL CHAPTER B INDEX ...