CHAPTER 5: MONITORING
A3 POWER ANALYSIS
PQM POWER QUALITY METER – INSTRUCTION MANUAL
5–31
Switch Input C Alarm/Control Dropout
SW C ACTIVE
↓
Switch Input D Alarm/Control Pickup
SW D ACTIVE
↑
Switch Input D Alarm/Control Dropout
SW D ACTIVE
↓
Pulse Input 1 Alarm/Control Pickup
PULSE IN 1
↑
Pulse Input 1 Alarm/Control Dropout
PULSE IN 1
↓
Pulse Input 2 Alarm/Control Pickup
PULSE IN 2
↑
Pulse Input 2 Alarm/Control Dropout
PULSE IN 2
↓
Pulse Input 3 Alarm/Control Pickup
PULSE IN 3
↑
Pulse Input 3 Alarm/Control Dropout
PULSE IN 3
↓
Pulse Input 4 Alarm/Control Pickup
PULSE IN 4
↑
Pulse Input 4 Alarm/Control Dropout
PULSE IN 4
↓
Totalized Pulses Alarm/Control Pickup
PULSE TOTAL
↑
Totalized Pulses Alarm/Control Dropout
PULSE TOTAL
↓
Current THD Alarm/Control Pickup
CURRENT THD
↑
Current THD Alarm/Control Dropout
CURRENT THD
↓
Voltage THD Alarm/Control Pickup
VOLTAGE THD
↑
Voltage THD Alarm/Control Dropout
VOLTAGE THD
↓
Main Analog Input Alarm/Control Pickup
AN INPUT MAIN
↑
Main Analog Input Alarm/Control Dropout
AN INPUT MAIN
↓
Alternate Analog Input Alarm/Control Pickup
AN INPUT ALT
↑
Alternate Analog Input Alarm/Control Dropout
AN INPUT ALT
↓
Self Test Failure Alarm Pickup
SELF TEST
↑
Self Test Failure Alarm Dropout
SELF TEST
↓
COM1 Failure Alarm Pickup
COM1 FAILURE
↑
COM1 Failure Alarm Dropout
COM1 FAILURE
↓
COM2 Failure Alarm Pickup
COM2 FAILURE
↑
COM2 Failure Alarm Dropout
COM2 FAILURE
↓
Clock Not Set Alarm Pickup
CLOCK NOT SET
↑
Clock Not Set Alarm Dropout
CLOCK NOT SET
↓
Critical Setpoints Not Stored Alarm Pickup
PARAM NOT SET
↑
Table 5–1: List Of Possible Events (Sheet 3 of 4)
EVENT NAME
DISPLAYED EVENT NAME