S
LOW
O
PERATION
FOR
M
AINTENANCE
P
URPOSES
REV7
/REV3
OI 250 (EN)
146
Installing the Slow Operation Device
• Place the support plate (17) of the slow operation device (15) on
the upper right spacer sleeve (18) and prop the device against the
mechanism housing.
• Attach the hook (19) of the slow operation device to the pin (20) of
the support latch (21).
Closing Manually
• Turn the hexagon nut (22) clockwise until the support latch (21) of
the roller follower (23) engages with the opening latch (24) by
audibly snapping into place.
• During the slow closing operation, the opening springs in the pole
columns and the mechanism are charged simultaneously.
Overcharging is prevented by the stop sleeve (25).
• The breaker position indicator is now in the closed position.
17 Support plate
22 Hexagon nut
18 Spacer sleeve
23 Roller follower
19 Hook
24 Opening latch
20 Pin
25 Stop sleeve
21 Support latch
22
17
18
25
23
21
19
20
24
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...