I
NSTALLATION
OI 250 (EN)
REV7
/REV7
6.5.3
Aligning the Lattice Supports
• Using a water level or hydrostatic level, align the lattice supports
(1) with one another at the same height and in the longitudinal
and transverse directions by adjusting the nuts (2) on the anchor
bolts (4). Use the upper surfaces of the lattice supports (mounting
surfaces for pole column) as the reference surface. Tighten the
nuts to a torque of 250 Nm and lock them.
1
Lattice support 1x
2
Nut, M24
12x
3
Washer, 24
8x
4
Anchor bolts
Provided at site by customer (corrosion-
resistant steel with minimum strength of
Rp 235N/mm²)
5
Foundation
Provided at site by customer
6
Lifting tackle
-
6
1
5
4
3
2
BA-
P-G
ITT
ER
-G
S-H
E
BE
N
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...