R
ECONDITIONING
OI 250 (EN)
REV7
/REV7
10.1.4
Disconnecting the Making and Breaking Units
• Remove the cotter pins (10) and flanged coupling pins (9) from
the two guide levers. We recommend tool T101 for removing the
cotter pins.
• Pull the interrupter unit out of the movable contact system.
10.1.5
Reconditioning the Movable Contact System
• Replace the arcing contact pin (29). Lubricate the contact
surfaces per lubrication specification L6. Tighten the screw (30) to
a torque of 25Nm.
• Replace the guide strip (11). The guide strip is located in a
dovetail groove. It is therefore necessary to overcome
mechanical resistance when replacing it.
• Lubricate the outer diameter of the movable contact system in the
area of the electrical sliding contact surface per lubrication
specification L6.
5
Interrupter unit
1x
6
Movable contact system
1x
8
Guide lever
2x
9
Flanged coupling pin, 6x24
4x
10
Cotter pin, 8x1.2
4x
5
6
8
9
10
BA
-P
-PS
-4
11
Guide strip 3x5x398
1x
15
NLX8 Nordlock washer
1x
29
Arcing contact pin
1x
30
Socket head cap screw, M8x20 A-70
1x
L6
29
11
15
30
L6
L6
B
A
-P
-PS
-5
Summary of Contents for GL 311 F3/4031 P/VE
Page 2: ......
Page 10: ...INTRODUCTION 10 146 OI 250 EN REV7 REV6...
Page 12: ...SAFETY 12 146 OI 250 EN REV7 REV3...
Page 48: ...INSTALLATION 48 146 OI 250 EN REV7 REV7...
Page 80: ...INSPECTION AND MAINTENANCE 80 146 OI 250 EN REV7 REV3...
Page 102: ...RECONDITIONING 102 146 OI 250 EN REV7 REV7...
Page 104: ...END OF LIFE MANAGEMENT 104 146 OI 250 EN REV7 REV2a...
Page 114: ...SPECIAL EQUIPMENT OPTIONAL 114 146 OI 250 EN REV7 REV0...
Page 128: ...REPLACEMENT PARTS AND ACCESSORIES 128 146 OI 250 EN REV7 REV6...
Page 130: ...HANDLING USED SULFUR HEXAFLUORIDE 130 146 OI 250 EN REV7 REV2...