Critical Power
Modifications reserved
Page 22/60
GE_UPS_ISG_TLE_SUL_M16_M50_2bU_V010.docx
Installation Guide
TLE Series 160 - 500 UL S2B
4.6
UNPACKING
Move the equipment in it’s original packing, carton box or wooden case, until the place of installation
and remove the packing and the transport sockets only just before installing the UPS.
Be aware of the heavy weight of the UPS, pay attention when moving the UPS cabinet.
White colour
=
without any anomaly
Red colour
=
anomaly evidence
The package of the
TLE Series 160 - 500
is
equipped with
ShockWatch
(indicator for
shock), and
TiltWatch
(indicator for
overthrow) on the outside.
These devices indicate an eventual shock
or overthrow during transport.
Whenever these devices show a
possible anomaly, the UPS shall not be
commissioned.
Please contact your
“GE Service
Center”
.
Fig. 4.6-1 ShockWatch device
Fig. 4.6-2 TiltWatch device
NOTE !
Be aware of the heavy weight of the UPS, pay attention when moving the UPS
cabinet.
Take care not to damage the UPS when moving by forklift.
A damaged UPS must never be installed or connected to
Utility
or
Battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.
Included in the delivery you can find the following parts:
•
An accessories bag.
•
Air inlet grids, which must be mounted on the bottom of the cabinet UPS with the screws included.
•
Control Bus cables for inter-connecting the UPS modules (only For the RPA system).
•
The documentation includes the
“Installation Guide & User Manual”
and the
“UPS Safety Rules”
.
PACKING MATERIAL RECYCLING
GE
, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.