Openings for input and output cable connections
Fig. 4.4.1-2 TLE Series 160 - 220 - 225 - 250 Opening on top of the cabinet for input and output cables connections
Fig. 4.4.1-3 TLE Series 300 - 400 - 500 Opening on top of the cabinet for input and output cables connections
Fig. 4.4.1-4 TLE Series 160 - 220 - 225 - 250 Opening on the bottom of the cabinet for input & output cables connections
Fig. 4.4.1-5 TLE Series 300 - 400 - 500 Opening on the bottom of the cabinet for input & output cables connections
TLE Series 160 - 500
openings are provided on the top (*) and the bottom (*) of the UPS for the
connection of input and output cables.
Pay attention to the position of these openings, when choosing the placement of the UPS.
These openings are covered with a protective plate.
*
) Please remove the plate before drilling any holes.
Utility input
Output load
Battery
9.85 "
250 mm
44.10"
1120 mm
0.99 "
25 mm
TLES_UL_225-250_
S1_UPS view top_01U
S
FRONTAL SIDE
1 "
2
5 m
m
29.5
3 "
750
mm 34.06
"
865
mm
Utility input
Output load
Battery
10.83 "
275 mm
63.78"
1620 mm
1.38 "
35 mm
TLES_UL_400-500_S
1_UPS view top_01U
S
FRONTAL SIDE
1 "
25 m
m
29.5
3 "
750 m
m
34.0
6 "
865 m
m
FRONTAL SIDE
8.27 "
210 mm
TLES_UL_225-250_S
1_UPS view bottom
_01US
Utility input
Load output
Battery
29.53 "
750 mm
34.0
6 "
865
mm
44.10"
1120 mm
0.99 "
25 mm
1.97 "
50 mm
FRONTAL SIDE
9.73 "
247 mm
TLES_UL_400-500_S
1_UPS view bottom
_01US
Utility input
Load output
Battery
29.10 "
739 mm
34.06 "
865 m
m
63.78"
1620 mm
2.05 "
52 mm
2.68 "
68 mm