
Chapter 2. INSTALLATION
6 | ADTS 405 Mk2 Instruction Manual-English
© 2015 General Electric Company – All rights reserved.
When using packing materials other than the original, proceed as follows:
1.
Wrap unit in polyethylene sheeting.
2.
Select a double-wall cardboard container. Inside dimensions must be at least 15 cm
greater than the equipment. The carton must meet test strength requirements of >125 kg.
3.
Protect all sides with shock-absorbing material to prevent equipment movement within
the container.
4.
Seal carton with approved sealing tape.
5.
Mark carton “FRAGILE” on all sides, top, and bottom of shipping container.
Note:
For ADTS 405R rack units loose or peripheral items should be placed in a
sealed polythene bag. For ADTS 405F stow the power supply cable, hand
terminal cable and the hand terminal in the ADTS 405F lid. Fit the lid to the
unit.
Summary of Contents for Druck ADTS 405 R/F Mk2
Page 2: ......
Page 14: ...xii ADTS 405 Mk2 Instruction Manual English 2015 General Electric Company All rights reserved ...
Page 16: ...xiv ADTS 405 Mk2 Instruction Manual English 2015 General Electric Company All rights reserved ...
Page 18: ...xvi ADTS 405 Mk2 Instruction Manual English 2015 General Electric Company All rights reserved ...
Page 121: ......