GE Multilin
B30 Bus Differential System
C-21
APPENDIX C
C.5 IEC 61850 IMPLEMENTATION VIA ENERVISTA UR SETUP
C
The
IED Section
node describes the configuration of an IED.
Figure C–9: SCD FILE STRUCTURE, IED NODE
C.5.6 IMPORTING AN SCD FILE WITH ENERVISTA UR SETUP
The following procedure describes how to update the B30 with the new configuration from an SCD file with the EnerVista
UR Setup software.
1.
Right-click anywhere in the files panel and select the
Import Contents From SCD File
item.
2.
Select the saved SCD file and click
Open
.
842794A1.CDR
IED Section (IED 1)
AccessPoint (name)
Server
Authentication (none)
LDevice (inst)
LN0 (InType, InClass, inst)
DataSet elements
DOI elements
Inputs
GSEControl elements
ReportControl elements
ExtRef (iedName, ldInst, prefix, lnClass, lnInst, doName, daName, intAddr)
Other ExtRef elements
Summary of Contents for B30 UR Series
Page 10: ...x B30 Bus Differential System GE Multilin TABLE OF CONTENTS ...
Page 122: ...4 30 B30 Bus Differential System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 326: ...5 204 B30 Bus Differential System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 412: ...A 12 B30 Bus Differential System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 554: ...D 10 B30 Bus Differential System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Page 566: ...E 12 B30 Bus Differential System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...
Page 574: ...F 8 B30 Bus Differential System GE Multilin F 3 WARRANTY APPENDIX F F ...