1.5 USING THE RELAY
1 GETTING STARTED
1
5.
Visual inspection for any damage, corrosion, or dust.
6.
Event recorder file download with further events analysis.
7.
LED Test and pushbutton continuity check.
Unscheduled maintenance, such as a disturbance causing system interruption:
1.
View the event recorder and oscillography or fault report for correct operation of inputs, outputs, and elements.
If it is concluded that the relay or one of its modules is of concern, contact GE Multilin for service.
Summary of Contents for B30 UR Series
Page 10: ...x B30 Bus Differential System GE Multilin TABLE OF CONTENTS ...
Page 122: ...4 30 B30 Bus Differential System GE Multilin 4 3 FACEPLATE INTERFACE 4 HUMAN INTERFACES 4 ...
Page 326: ...5 204 B30 Bus Differential System GE Multilin 5 10 TESTING 5 SETTINGS 5 ...
Page 412: ...A 12 B30 Bus Differential System GE Multilin A 1 PARAMETER LISTS APPENDIX A A ...
Page 554: ...D 10 B30 Bus Differential System GE Multilin D 1 IEC 60870 5 104 APPENDIX D D ...
Page 566: ...E 12 B30 Bus Differential System GE Multilin E 2 DNP POINT LISTS APPENDIX E E ...
Page 574: ...F 8 B30 Bus Differential System GE Multilin F 3 WARRANTY APPENDIX F F ...